Publications

Filter
Topic
Publication State
Showing 1 - 10 of 125 Publications
Hydrology Update to the Austroads Guide to Road Design Part 5
This report documents the changes to Section 6 &ndash
Webinar: 2022 Winners of the Austroads Bridge Awards
The webinar showcases the projects recognised with the Austroads Bridge Awards. The Austroads Bridge Awards acknowledge individuals and organisations that have delivered outstanding bridge structures and design across Australia and New Zealand. The…
Webinar: Changes to Guide to Road Design Part 5 – Improvements to the Regional Flood Frequency Estimation Method
This is the second webinar in a two-webinar series, and it covers the improvements made to the Regional Flood Frequency Estimation (RFFE) method in the Guide to Road Design Part 5.
Webinar: Changes to the Guide to Road Design Part 5: Drainage – General and Hydrology Considerations
In response to feedback provided by industry and stakeholders, Austroads has reviewed its Guide to Road Design Part 5: Drainage &ndash
Guide to Road Design Part 5: Drainage-General and Hydrology Considerations
The Guide to Road Design Part 5: Drainage – General and Hydrology Considerations provides road designers and other practitioners with guidance on the design of drainage systems.
Guide to Road Design Part 5A: Drainage: Road Surface, Networks, Basins and Subsurface
The Guide to Road Design Part 5A: Drainage: Road Surface, Networks, Basins and Subsurface, provides road designers and other practitioners with guidance on the design of the collection and discharge of water from road surfaces, pit and pipe systems,…
Guide to Road Design Part 5B: Drainage-Open Channels, Culverts and Floodway Crossings
Guide to Road Design Part 5B: Drainage &ndash
Selection of the most suitable electrochemical repair technique for rehabilitation of concrete bridges and structures
Transport for NSW (TfNSW) utilises various electrochemical protection systems such as cathodic protection, chloride extraction and re-alkalisation. Whilst the technical merits for re-alkalisation and chloride extraction are proven, there have been…
Birkenhead Bridge Bascule Span Deck Replacement
Opened in 1940, the Birkenhead Bridge over the Port River has a double leaf bascule opening central span. The bridge provides a critical road connection between Port Adelaide and Birkenhead while allowing shipping to access the inner harbor and its…
Long-term effects of AAR in a 70-year-old concrete structure
A concrete dam structure constructed around 70 years ago, was originally identified to be affected by Alkali-Aggregate Reaction (AAR) in 2002, and at the time some chemical, mechanical and microstructural properties of concrete in various parts of…