The costs of sourcing traditional pavement materials are increasing as sources are being exhausted, haulage distances are increasing, and access to traditional sources is increasingly restricted. As a result, jurisdictions are seeking alternative…
Austroads Project TS1456 (Expanded Operating Speed Model) was established to update and expand the road design operating speed models used in Australia. In particular, the project reviewed the validity of the existing operating speed model for rural…
This project achieved the objective of consolidating the available research on the impacts of lower speed limits on network operations. It extended this knowledge to bridge an identified knowledge gap regarding urban arterial roads by modelling the…
The objective of this project was to provide advice to jurisdictions on appropriate speed limit setting policy in light of harm minimisation (the Safe System approach). This advice was based on the improved understanding of the relationships between…
Speed-related crashes are a continuing concern in Australasia. On behalf of Austroads, ARRB Group undertook to develop a framework for an intervention to promote safe driving among recidivist speeders.
Five key tasks were carried out: a literature…
The composition of the Australian heavy vehicle fleet has changed over time and no doubt will continue to change in response to pressures to achieve maximum economic benefits. Considering the predicted doubling in the road freight task by 2020, the…