Publications

Filter
Topic
Publication State
Showing 1 - 10 of 68 Publications
Optimising Project Delivery Performance (Accelerated Projects)
This report provides practical advice and examples of ways to successfully accelerate transport infrastructure projects and programs up to $500 million. An accelerated project or program has delivery expedited, typically in response to external…
Austroads Test Methods and Specifications
This document provides a hyperlinked list of the Austroads Test Methods and Specifications.
Code of Practice for the Management of Alkali Aggregate Reactivity Template
The Code of Practice for the Management of Alkali Aggregate Reactivity template has been developed for the use of Austroads member agencies. The document outlines the management strategies, testing and approval process required to regulate alkali…
Supply and Placement of Steel for the Reinforcement of Concrete
Austroads Technical Specification ATS 5310 sets out the requirements for the supply, fabrication, handling and placement of steel used for the reinforcement of concrete (&lsquo
Supply of Bolts, Nuts and Washers
Austroads Technical Specification ATS 5420 sets out the requirements for the supply of bolts, nuts, screws, washers, studbolts and threaded rods for steelwork. It also includes requirements for the supply of stainless steel fasteners. This…
Cementitious Patch Repair of Concrete
Austroads Technical Specification 5340 sets out the requirements for the patch repair of defective concrete using cementitious materials. The process of restoring existing concrete typically includes: breaking back to sound and dense concrete to…
Calibration of Bitumen Sprayers: General Introduction and List of Methods
This test method provides an overview of the 
General Conditions of Contract for Construction - National Capital Works 4 (NCW4)
General Conditions of Contract for Construction - National Capital Works 4 (NCW4) has been developed for use in “construct only” contracts where the principal is a government or semi-government agency.
Webinar: General Conditions of Contract for Construction - National Capital Works 4 (NCW4)
This webinar, presented on 25 July 2019, provides an overview of the new General Conditions of Contract for Construction - National Capital Works 4 (NCW4), released by Austroads and the Australian Procurement and Construction Council (APCC).
Calibration of Bitumen Sprayers: Volumetric Calibration of Bitumen Pumping Systems
This test method is for bitumen sprayers as specified in AGPT/T530 Calibration of bitumen sprayers: