Publications

Filter
Topic
Publication State
Showing 1 - 10 of 290 Publications
Webinar: National Telematics Framework: Setting a Benchmark for Intelligent Access
For over a decade, the National Telematics Framework has been setting a benchmark as an effective regulatory framework for optimised vehicle movements, making Australia a world-leader in intelligent access management. The National Telematics…
Webinar: Australian 3G Network Shutdown
Between December 2023 and September 2024, Telstra, Optus and Vodafone will close their 3G networks to make room for new, faster services. The 3G network shutdown will affect vital equipment and services across the road transport sector. Devices that…
Webinar: NSW’s Transition to Smart On-Board Mass for PBS Mass Monitoring
Transport for NSW (TfNSW) is transitioning from Interim On-Board Mass (OBM) management to Smart OBM. All Performance Based Standards (PBS) vehicle operators with mass monitoring as a condition of access will need to transition to the more advanced…
Webinar: Victorian Government’s Enrolment of Smart OBM
The Department of Transport and Planning Victoria has announced 30 June 2023 as the final deadline to have smart on-board mass (OBM) systems fitted to certain high productivity freight vehicles (HPFVs). Beyond this date, the mass limits of the below…
Webinar: 2022 Winners of the Austroads Bridge Awards
The webinar showcases the projects recognised with the Austroads Bridge Awards. The Austroads Bridge Awards acknowledge individuals and organisations that have delivered outstanding bridge structures and design across Australia and New Zealand. The…
Webinar: Queensland’s Transition from IAP to TMA
The Queensland Department of Transport and Main Roads has announced upcoming changes which will harmonise the use of National Telematics Framework applications for heavy vehicles in Queensland with other jurisdictions. These changes will include…
Mitigating the risk of acidification in reinforced concrete bridge impressed current cathodic protection systems
One of the main remedial treatments for reinforced concrete structures such as bridges in marine environments is impressed current cathodic protection (ICCP). Many ICCP systems in marine environments have manifested backfill mortar deterioration due…
Innovative Incrementally Launched U-Trough Girder Viaduct for Challenging Site
The innovative Viaduct over Muscle Creek and Hunter River with an overall length of 178.4m comprises four spans of 45.7m by 50m by 50m by 29.7m and 1.5m length beyond the bearings at each abutment, to suit a challenging and restrictive site. The…
The design of asymmetric continuous twin U-trough rail viaduct with hybrid pre-stressing
Whiteman Park Viaduct is part of the new 21 km Morley-Ellenbrook Rail Line (MEL) from Bayswater to Ellenbrook, in the Perth Metropolitan area in Western Australia. The viaduct is required to elevate MEL at the Whiteman Park Station precinct to allow…
Longest weathering steel arch in Australia to carry light rail on the Parramatta Light Rail
Parramatta Light Rail Stage 1 project includes James Ruse Underbridge which carries two light rail tracks and a 3.75 m wide shared user path across James Ruse Drive. To clear this busy road and a future planned widening, a single span of 64 m…