Skip navigation
Open main navigation
Open/Close Search bar
Search
View Cart
Drivers & Vehicles
Toggle
Drivers & Vehicles
This section includes managing drivers with health risks, requirements for visiting drivers, NEVDIS, and the introduction of connected and automated vehicles to Australasia.
Assessing Fitness to Drive
Vehicles and Technology
NEVDIS
Overseas Drivers
Registration and Licensing
Road Safety & Design
Toggle
Road Safety & Design
This section covers safety barrier assessments, and the work of the Road Safety Task Force and Road Design Task Force.
Barrier Assessment
Road Safety
Road Design
Safety Hardware Training and Accreditation Scheme (ASHTAS)
Transport Operations
Toggle
Transport Operations
In this section you'll find information about our work to improve the efficient, reliable and safe operation of the road network for all road users.
Network Operations
Traffic Management
Temporary Traffic Management
Freight
Active Travel
Transport Infrastructure
Toggle
Transport Infrastructure
This section includes information about strategic asset management, the management of bridges, pavements and tunnels, project delivery and the national prequalification system.
Asset Management
Bridges
National Prequalification
Pavements
Project Delivery
Road Tunnels
Technical Specifications
About
Contact
News
Events
Projects
Publications
Tenders
Login
Home
Publications
Publications
Share
Subject area
All
Bridges
Network
Traffic Management
Search publications library
Filter
Open/Close All Filters
Type
Type
Conference Papers
5
Research Reports
7
Topic
Topic
Aggregate test methods
13
Air quality
14
Annual reports
13
Asphalt
20
Bicycles
16
Binders
16
Binders test methods
13
Bitumen
17
Bridge assessment
30
Bridge barriers
14
Bridge components
17
Bridge construction
37
Bridge design
53
Bridge maintenance
39
Bridge management
27
Bridge materials
29
Bridge performance
21
Capability assessment
13
Community attitudes
14
Concrete
25
Congestion
14
Cooperative ITS
13
Crash analysis
14
Data management
17
Driver licensing
13
Economic evaluation
15
Equipment test methods
14
Fibre reinforced polymer
14
Financing
13
Freight policy
13
Geotextiles
13
Granular materials
14
Heavy vehicle access
19
Heavy vehicle safety
14
Incident management
17
Intelligent transport systems
18
Intersection design
13
Level of service
14
Logistics
13
Materials testing
33
Motorcycles
13
Network management
Network performance
13
Noise
14
Other assets management
13
Pavement construction
14
Pavement design
22
Pavement investigation test methods
14
Pavement maintenance
15
Pavement management
27
Pavement performance
40
Pedestrians
Performance based standards
13
Performance indicators
12
Prequalification
13
Process and documentation
14
Procurement
16
Project governance
14
Project planning
14
Public transport
14
Rail bridges
20
Risk assessment
13
Road pricing
14
Roadside design
14
Rural and remote
15
Safe people
13
Safe roads
16
Safe System
14
Safety strategy
14
Seals
21
Smart motorways
13
Speed management
14
Steel
15
Strategic asset management
15
Structures management
19
Timber
14
Traffic modelling
13
Traffic operations
12
Traffic theories and studies
13
Waterway design
13
Year
Year
2024
13
2023
18
2022
16
2021
25
2020
22
2018
14
2017
28
2016
14
2015
16
2014
2013
13
2012
13
2011
17
2010
13
2008
13
2007
2006
15
2004
13
2003
13
2002
15
2001
14
2000
22
1998
14
1995
13
Publication State
Publication State
Archived
1
Live
Sort by:
Relevance
Date (Newest first)
Date (Oldest first)
Title (A-Z)
Title (Z-A)
Publication Code (A-Z)
Publication Code (Z-A)
Showing 1 - 10 of 12 Publications
Network management
Remove Network management filter
Pedestrians
Remove Pedestrians filter
2014
Remove 2014 filter
2007
Remove 2007 filter
Live
Remove Live filter
Clear all filters
Clear all filters
Fully-matching results
Westgate Footbridge, Auckland New Zealand
ABC-DES802-14
22 Oct 2014
Bridges
More
The Westgate footbridge provides a new pedestrian and cyclist connection across four carriageways of State Highway 16 near the Westgate Shopping Centre in Auckland, NZ. The bridge is 3 m wide and consists of three separate structures
Review of AS 5100.2: Design Loads
ABC-AUS102-14
22 Oct 2014
Bridges
More
AS 5100, the Australian Bridge Design Code, is currently under review. AS 5100.2, Design Loads, sets out the minimum design loads, forces and load effect for road, railway, pedestrian and bicycle bridges and other associated structures.The review of…
Adelaide's Riverbank Footbridge
ABC-DES801-14
22 Oct 2014
Bridges
More
This elegant structure, opened in early 2014, is a key element of the revitalisation of Adelaide's Riverbank Precinct. The area is one of Adelaide's iconic public spaces, offering panoramic views across the River Torrens, Parklands and Adelaide Oval.…
Pedestrian Bridges on the Regional Rail Link Project, Victoria
ABC-DES104-14
22 Oct 2014
Bridges
More
The Regional Rail Link (RRL) project involves the construction of new regional tracks from Southern Cross Station in Melbourne, through to Sunshine, then west to Werribee. Within the Footscray to Deer Park section of the project, major pedestrian…
Hendon Park Pedestrian Bridge: A Bridge for the Future
ABC-CAS103-14
22 Oct 2014
Bridges
More
The Hendon Park Pedestrian Bridge will be a landmark feature of the NZ Transport Agencys Waterview Connection project forming the final link of Aucklands Western Ring Route. The bridge is designed to carry a 320 m long shared path over SH20 to…
Operational Management of Arterial/Managed Motorway Interfaces for Network Optimisation
AP-R454-14
18 Mar 2014
Network
1 results from the same Publication
More
Signalised interchanges and ramp metering are major components of the interface between the arterial road system and the motorway system. The control systems of motorways and arterials are often treated as separate control components, which can…
Tools that Impact Network Performance: Measurement and Evaluation Tools
AP-R310-07
22 Oct 2007
Network
1 results from the same Publication
More
This report reviews the tools that monitor, measure and evaluate the performance of the road network, for both arterials and freeways. The interest in measurement and evaluation tools for the overall network is mainly driven by the need to operate…
National Performance Indicators for Network Operations
AP-R305-07
1 Oct 2007
Traffic Management
More
This report presents the definitions and calculations of five new network performance indicators. These indicators are measured on-line with the use of freeway and arterial traffic control systems. These systems provide 24-hour 7-day traffic data at…
Tools that Impact Network Performance: Summary Report
AP-R313-07
1 Oct 2007
Network
More
This Austroads project was initiated to enable road authorities to develop a better understanding of how various traffic management tools and proposed operational changes to the road network affected the performance of the entire road network, with…
Tools that Impact Network Performance: Integrated Tools
AP-R309-07
1 Oct 2007
Network
More
Integrated tools can be a toolbox of technologies and procedures which combine both hard engineering methods such as the use of shoulders and lane access controls as well as dynamic traffic management tools such as ramp meters, incident detection,…
1
2
Next
Latest news
21 May 2024
New report details findings of survey of medical practices and practitioners
13 May 2024
Austroads and AfPA update bituminous binder sampling practice guidelines
9 May 2024
Neil Scales honoured with Austroads Medal for transformational leadership
Sign up for our monthly newsletter RoadWatch Roundup
Name
Email
Hide Feedback button
Feedback
Close
Feedback form
Name
Email
Repeat email address
Telephone
What type of feedback would you like to leave?
Select…
Compliment
Complaint
Suggestion
Feedback text area...
Would you like a response?
Yes
No