Publications

Filter
Topic
Publication State
Showing 1 - 10 of 21 Publications
Best Practice Guidance to Meet the Changing Needs of Transport Network Operations: Strategic Review of Austroads Guide to Traffic Management
This study aims to set a clear plan for the evolution of the Austroads Guide to Traffic Management to ensure it continues to meet the needs of users and remains a critical resource for member agencies and industry. The study was undertaken over…
Opportunities to Build Capacity in Traffic Management
This report documents a project addressing a recognised lack of traffic management knowledge and skills in young practitioners through the development of a series of online learning modules in traffic management. This report brings together the…
Improved Guidance on Interrupted Traffic Flow Theory
This report summarises activities undertaken to update guidance on interrupted traffic flow theory contained within Austroads Guide to Traffic Management Part 2 and Part 3. The updates to the guidance will enable practitioners to improve their…
Standardisation of ITS Technology Asset Management Datasets
This report documents the first version of harmonised ITS asset performance and condition data specifications, which was developed via practice review, stakeholder consultation and case studies. The data specifications cover 155 ITS asset data items…
Network Performance Indicators
The purpose of the Austroads NEG1995: Network Performance Indicators study is to understand customer and community expectations with respect to the Austroads Network Performance Indicators (NPIs). In order to fulfil the study purpose and seek to…
Reassessment of the Benefits and Impacts of the Use of High Productivity Vehicles on Australian Highway Pavements
This report reassesses the benefits and impacts of using High Productivity Vehicles (HPVs) and proposes a method to consistently quantify pavement vertical loading of an individual vehicle design.
Improving High Productivity Vehicle Access through Potential Charging Regimes
This study assessed how charging regimes could increase high productivity vehicle (HPV) access, using three case study insights.
The Application of Network Operations Planning Framework to assist with Congestion Management and integrated land use and transport
The Austroads Network Operation Planning Framework (the Framework) was developed in 2009 however it is not widely used by road agencies. This research aimed to understand each road agency’s approach and consider how the Framework could be improved…
Investigating the Development of a Bridge Assessment Tool for Determining Access for High Productivity Freight Vehicles
This report deals with the first component of the bridge assessment tool and is a scoping study to determine whether there is sufficient data, and whether there exists suitable engineering models, to develop robust and nationally uniform technical…
Feasibility Study: Heavy Vehicle Charging in Australia
This report presents the findings of a Feasibility Study, conducted by Rapp Trans on behalf of Austroads, into procedural, technical and market issues associated with potential business models to support the reform of heavy vehicle charging in…