Publications

Filter
Topic
Publication State
Showing 1 - 10 of 20 Publications
Austroads LTPP/LTPPM Study - Final Summary Report 2017-18
The report provides a summary of works undertaken during the period 2017&ndash
Webinar: Appropriate Use of Marginal and Non-standard Materials in Road Construction and Maintenance
This webinar, presented on 17 July 2018, outlines ways to optimise the use of marginal and non-standard materials and gain best value from the successful performance of standard materials. It covers: applying a proposed assessment process to a wider…
Design and Performance of Foamed Bitumen Stabilised Pavements
There is a need to improve the Austroads procedures for mix design and structural design of foamed bitumen stabilised (FBS) materials. This final report summarises the mix design test methods developed within the context of an Austroads mix design…
Guide to Asset Management Technical Information Part 12: Pavements Asset Management
Part 12 of the Guide to Asset Management is directed at practitioners involved in all aspects of pavement management. It provides the most up-to-date information, using consistent and efficient processes, for the management, storage, analysis and…
Guide to Asset Management Technical Information Part 15: Technical Supplements
The technical supplements presented in Part 15 of the Guide to Asset Management cover the knowledge and condition assessment of pavements, structures and other assets.
Appropriate Use of Marginal and Non-standard Materials in Road Construction and Maintenance
This report considers the use of marginal and non-standard materials in road construction and maintenance. It concludes that considerable evidence exists, both nationally and internationally, that supports the wider use of marginal and non-standard…
Long-term Pavement Performance (LTPP) Project: Future Directions
This report presents the proposed future directions for long-term pavement performance (LTPP) studies in Australasia. The proposed way forward is based on the results of a 2017 survey directed to the LTPP Project Steering Group (PSG) and Assets Task…
Effectiveness of Maintenance Activities on Pavement Conditions
The aim of this project was to clarify the effectiveness of pavement maintenance (preservation) activities, in the form of periodic maintenance and rehabilitation, on pavement condition and distress (roughness, rutting and cracking) deterioration…
Austroads LTPP/LTPPM Study - Summary Report 2016–17

The report provides a summary of works undertaken during the period 2016–17 for the Austroads project AT1064 – Long-term pavement performance (LTPP).

Austroads has funded the long-term pavement performance study since late 1994. The project monitors…

Practical Application of an Alternative Roughness Profile Validation Technique (Prem Method)

The main objective of this study was to assess the profiler gain validation technique as an alternative method for validating laser profilers that measure road roughness. The study sought to identify a suitable reference profiler against which other…