Publications

Filter
Topic
Publication State
Showing 1 - 10 of 28 Publications
Webinar: Validation of Superpave™ Method of Asphalt Compaction for Australasia
Austroads has completed a project to replace the obsolete gyratory compactors used in design and quality control testing of asphalt mixes and update its Guide to Pavement Technology Part 4B: Asphalt. Austroads asphalt mix design procedure currently…
Webinar: National Harmonisation of Test Methods Used in Asphalt Performance Specifications
The asphalt industry is rapidly evolving, and it is widely accepted that prescriptive specifications are not necessarily well suited to take full advantage of the benefits that new and innovative technologies can provide. There is therefore a desire…
National Harmonisation of Test Methods Used in Asphalt Performance Specifications
This report documents the delivery of the first component of a new Austroads performance-related asphalt specification framework. This included the development of several new test methods and updating a number of existing test methods for use in…
Webinar: Guide to Project Delivery Parts 2 and 3 Update
Two parts of the Austroads Guide to Project Delivery &ndash
Guide to Project Delivery Part 3: Contract Management
The Guide to Project Delivery consists of five parts. Part 3 is concerned with the procurement and management of road construction contracts. It covers in detail, key processes and procedures relating to documentation and contract administration. It…
Webinar: Procurement Decision Tool: A Case Study of the Toowoomba Second Range Crossing
This webinar, presented by Adrian Bridge on 31 July 2020, provides an overview of a new procurement decision tool and its application to a road infrastructure project, the Toowoomba Second Range Crossing (TSRC) in Queensland. The procurement…
Procurement Decision Tool: A Case Study of the Toowoomba Second Range Crossing
The procurement decision tool (&ldquo
Webinar: Investigation and Development of Bridge Formulae for Inclusion in the Performance-based Standards
This webinar, presented on 29 April 2020, discusses the merits of three options to advance the future of PBS access in Australia as it relates to bridges. The webinar explains the role that PBS bridge formulae play in vehicle design and approval. It…
Investigation and Development of Bridge Formulae for Inclusion in the Performance-based Standards
The May 2018 National Transport Commission review of the Australian Performance-Based Standards (PBS) scheme revealed the need to improve the efficiency of heavy vehicle access via the PBS scheme to access substantial national freight productivity,…
General Conditions of Contract for Construction - National Capital Works 4 (NCW4)
General Conditions of Contract for Construction - National Capital Works 4 (NCW4) has been developed for use in “construct only” contracts where the principal is a government or semi-government agency.