Publications

Filter
Topic
Publication State
Standardised Signage and Pavement Symbols for Low and Zero Emission Vehicles
This report, published in January 2022, provides a basis for future testing and standardisation of the symbols and road signage for low and zero emission vehicles in Australia and New Zealand, paving the way to adopt consistent symbols in the road…
Network Signage for Over Height Vehicles Approaching Road Tunnels
This report, originally published in November 2021, outlines the findings of a project to develop clearer and more consistent tunnel signage to reduce the impact of over-dimensioned and dangerous goods vehicles on both infrastructure and Workplace…
Cone Penetration of Hot Poured Joint Sealant
This test method describes the procedure for determining the cone penetration of a joint sealant at 25 
Flow Properties of Hot Poured Joint Sealant
This test method describes the procedure for determining the resistance of hot poured joint sealants to flow at a temperature of 70 °
Preparation of Hot Poured Joint Sealant for Laboratory Testing
This test method sets out the procedure to be used to prepare joint sealant samples for testing.
Heat Degradation of Hot Poured Joint Sealant
This test method describes the procedure for determining the degree to which a joint sealant is degraded by heat during prolonged storage (6 
Bituminous Pavement Crack Sealing
Austroads Technical Specification ATS 3470 sets out the requirements for: the supply of hot placed elastomeric / crumb rubber joint sealant
Webinar: Austroads Project Pipeline 2022-23
This webinar introduces Austroads new projects lined up for the 2022-23 financial year. The session is most beneficial to consultants who may be interested in tendering for Austroads projects. Upcoming projects focus on road network resilience,…
Webinar: Guide to Project Delivery Parts 2 and 3 Update
Two parts of the Austroads Guide to Project Delivery &ndash
Guide to Project Delivery Part 3: Contract Management
The Guide to Project Delivery consists of five parts. Part 3 is concerned with the procurement and management of road construction contracts. It covers in detail, key processes and procedures relating to documentation and contract administration. It…