Webinar: Optimising Project Delivery Performance – Accelerated Projects
Over the last decade there has been a trend by a number of governments to invest more heavily in transport infrastructure and systems, and to accelerate programs of work. This has been a response to various ‘burning platforms’ including transport…
Webinar: Guide to Project Delivery Parts 2 and 3 Update
Two parts of the Austroads Guide to Project Delivery &ndash
Guide to Project Delivery Part 2: Planning and Control
Guide to Project Delivery Part 2: Planning and Control gives guidance to project delivery practitioners on a number of concepts relating to planning and control of the delivery phase, as opposed to the preceding initiation phase and subsequent…
Webinar: Optimising Project Delivery Performance
This webinar, 
Optimising Project Delivery Performance
Austroads commissioned this study to investigate the current challenges and issues affecting the delivery of transport infrastructure projects and the consequential impacts on value for money, timeliness of delivery, agency and political reputation.…
2017 Revision of Australian Standard AS 5100 Part 2: Design Loads
Part 2 Design loads of Australian Standard AS 5100 Bridge design sets out the parameters for loads on all bridges in Australia. There have been numerous enhancements to improve the scope, clarity and intent. Design loads for road traffic barriers…
2017 Revision of Australian Standard AS 5100 Part 1: Scope and General
AS 5100 is the only Australian standard specific to bridges. For the first time, the scope has been extended from primarily a structural design standard to include other bridge related topics including safety-in-design, climate change and…
AS(AS/NZS) 5100 - 2017: Rail Bridge Design and Ratings - Key Changes
The revision of AS(AS/NZS) 5100 series has resulted in key changes to the provisions for train braking loads, dynamic load allowance, train collision loads, bridge bearings and design for light rail bridges. Longitudinal rail force provisions have…
A Rail Bridge in Twenty Days: The Torrens To Torrens North:South Corridor Upgrade
The Torrens Road to Torrens River (T2T) project forms part of the overall North-South Road Corridor upgrade in Adelaide, South Australia and incorporates many components such as a new lowered motorway, road, service and pedestrian bridges, retaining…
Replacement Of Four Long Bridges In Fiji Islands
Four bridges in the Fiji Islands were recently replaced using a Design and Construction procurement method for the Fiji Road Authority. The bridges provided vehicle, pedestrian and Fiji Sugar Corporation cane trains over waterways subjected to…