Skip navigation
Open main navigation
Open/Close Search bar
Search
View Cart
Drivers & Vehicles
Toggle
Drivers & Vehicles
This section includes managing drivers with health risks, requirements for visiting drivers, NEVDIS, and the introduction of connected and automated vehicles to Australasia.
Assessing Fitness to Drive
Vehicles and Technology
NEVDIS
Overseas Drivers
Registration and Licensing
Road Safety & Design
Toggle
Road Safety & Design
This section covers safety barrier assessments, and the work of the Road Safety Task Force and Road Design Task Force.
Barrier Assessment
Road Safety
Road Design
Safety Hardware Training and Accreditation Scheme (ASHTAS)
Transport Operations
Toggle
Transport Operations
In this section you'll find information about our work to improve the efficient, reliable and safe operation of the road network for all road users.
Network Operations
Traffic Management
Temporary Traffic Management
Freight
Active Travel
Transport Infrastructure
Toggle
Transport Infrastructure
This section includes information about strategic asset management, the management of bridges, pavements and tunnels, project delivery and the national prequalification system.
Asset Management
Bridges
National Prequalification
Pavements
Project Delivery
Road Tunnels
Technical Specifications
About
Contact
News
Events
Projects
Publications
Tenders
Login
Home
Publications
Publications
Share
Subject area
All
Bridges
Network
Project Delivery
Traffic Management
Search publications library
Filter
Open/Close All Filters
Type
Type
Conference Papers
3
Guides
2
Research Reports
1
Topic
Topic
Annual reports
8
Asphalt
14
Bicycles
16
Binders
10
Binders test methods
7
Bitumen
14
Bridge assessment
29
Bridge barriers
9
Bridge components
27
Bridge construction
64
Bridge design
124
Bridge maintenance
61
Bridge management
64
Bridge materials
44
Bridge performance
23
Capability assessment
7
Climate change
8
Concrete
31
Congestion
7
Cooperative ITS
10
Crash analysis
10
Data management
14
Digital engineering (BIM)
7
Driver licensing
7
Economic evaluation
15
Equipment test methods
9
Evaluation values
8
Fibre reinforced polymer
11
Financing
8
Freight policy
8
Geotextiles
7
Granular materials
8
Heavy vehicle access
14
Heavy vehicle safety
10
Indigenous communities
8
Intelligent transport systems
10
Intersection design
9
Land use
7
Logistics
7
Materials testing
28
Motorcycles
7
Network management
9
Network performance
7
Pavement construction
8
Pavement design
29
Pavement management
23
Pavement performance
36
Pedestrians
14
Performance based standards
8
Prequalification
7
Process and documentation
9
Procurement
9
Project governance
Project planning
7
Public transport
7
Rail bridges
23
Recycled material
7
Risk assessment
7
Road pricing
8
Roadside design
9
Rural and remote
9
Safe people
9
Safe roads
12
Safe System
10
Safe vehicles
7
Safety audit
8
Safety strategy
8
Seals
16
Smart motorways
7
Speed management
10
Steel
14
Strategic asset management
9
Structures management
21
Timber
9
Traffic controls
7
Traffic management
7
Traffic operations
Transport planning
7
Waterway design
11
Year
Year
2024
11
2023
11
2022
8
2021
9
2020
13
2017
9
2014
2011
2010
7
2004
7
1998
7
Publication State
Publication State
Archived
2
Live
Sort by:
Relevance
Date (Newest first)
Date (Oldest first)
Title (A-Z)
Title (Z-A)
Publication Code (A-Z)
Publication Code (Z-A)
Showing 1 - 6 of 6 Publications
Project governance
Remove Project governance filter
Traffic operations
Remove Traffic operations filter
2014
Remove 2014 filter
2011
Remove 2011 filter
Live
Remove Live filter
Clear all filters
Clear all filters
Fully-matching results
Operational Management of Arterial/Managed Motorway Interfaces for Network Optimisation
AP-R454-14
18 Mar 2014
Network
1 results from the same Publication
More
Signalised interchanges and ramp metering are major components of the interface between the arterial road system and the motorway system. The control systems of motorways and arterials are often treated as separate control components, which can…
Guide to Project Delivery Part 1: Overview
AGPD01-14
Edition: 3
3 Feb 2014
Project Delivery
More
The Guide to Project Delivery consists of five parts. Part 1 explains the context of project delivery in relation to the asset management functions and strategic planning process and its role and importance within the overall project management…
Guide to Project Delivery Part 4: Direct Management of Project Works
AGPD04-14
Edition: 2
3 Feb 2014
Project Delivery
More
Guide to Project Delivery consists of five parts. Part 4 outlines appropriate standards of practice and procedures for the delivery of works by direct management. It assumes that the agency has committed to undertake works using a direct managed…
Ballina Bypass Alliance -Tackling Quality
ABC-WPD011-11
31 Oct 2011
Bridges
More
In 2008, the Roads and Traffic Authority (RTA) of New South Wales(NSW) advised all contractors to improve workmanship quality across all RTA construction projects. This followed the discovery that many structures, including bridges, were not being…
Improving the Quality of Bridge (and Road) Construction
ABC-CAS005-11
31 Oct 2011
Bridges
More
The RTA has a large and growing construction budget each year for new works. All major works are carried out under Quality Assurance (QA) contracts. QA has been used to deliver construction contracts within the RTA since the early 1990’s. Within the…
Iron Cove Bridge Duplication
ABC-CAS006-11
31 Oct 2011
Bridges
More
The $175 million Inner West Busway project was awarded to the Bridge to Bay Alliance in October 2007 and involved the implementation of a new city bound bus lane on the 3.5 km section of Victoria Road between Gladesville Bridge and the Crescent in…
1
Latest news
21 May 2024
New report details findings of survey of medical practices and practitioners
13 May 2024
Austroads and AfPA update bituminous binder sampling practice guidelines
9 May 2024
Neil Scales honoured with Austroads Medal for transformational leadership
Sign up for our monthly newsletter RoadWatch Roundup
Name
Email
Hide Feedback button
Feedback
Close
Feedback form
Name
Email
Repeat email address
Telephone
What type of feedback would you like to leave?
Select…
Compliment
Complaint
Suggestion
Feedback text area...
Would you like a response?
Yes
No