Publications

Filter
Topic
Publication State
Showing 1 - 8 of 8 Publications
Webinar: Methodology for Comparing Dangerous Goods Risk in Road Tunnels to Those on Alternative Routes
This webinar presents the work involved in developing a standardised comparative risk assessment method for assessing life safety risk of dangerous goods being routed through the tunnel or via an alternative surface route.
Webinar: Optimising Project Delivery Performance – Accelerated Projects
Over the last decade there has been a trend by a number of governments to invest more heavily in transport infrastructure and systems, and to accelerate programs of work. This has been a response to various ‘burning platforms’ including transport…
Methodology for Comparing Dangerous Goods Risks in Road Tunnels to Those on Alternative Routes: Best Practice Review
This report is one of the three reports produced as part of a project undertaken to establish a comparative risk assessment method for assessing whether a tunnel route is safer than a surface route for the road transit of dangerous goods (DG)…
Methodology for Comparing Dangerous Goods Risks in Road Tunnels to Those on Alternative Routes: Case Study Using DG-QRAM in the Australasian Context
This report is one of the three reports produced as part of a project undertaken to establish a comparative risk assessment method for assessing whether a tunnel route is safer than a surface route for the road transit of dangerous goods (DG)…
Methodology for Comparing Dangerous Goods Risks in Road Tunnels to Those on Alternative Routes: Manual for Using DG-QRAM in the Australasian Context
This report is the second of the three reports produced as part of a project undertaken to establish a comparative risk assessment method for assessing whether a tunnel route is safer than a surface route for the road transit of dangerous goods (DG)…
Operational Management of Arterial/Managed Motorway Interfaces for Network Optimisation
Signalised interchanges and ramp metering are major components of the interface between the arterial road system and the motorway system. The control systems of motorways and arterials are often treated as separate control components, which can…
Guide to Project Delivery Part 1: Overview
The Guide to Project Delivery consists of five parts. Part 1 explains the context of project delivery in relation to the asset management functions and strategic planning process and its role and importance within the overall project management…
Guide to Project Delivery Part 4: Direct Management of Project Works
Guide to Project Delivery consists of five parts. Part 4 outlines appropriate standards of practice and procedures for the delivery of works by direct management. It assumes that the agency has committed to undertake works using a direct managed…