Publications

Filter
Publication State
Providing for Road User Error in the Safe System
This project investigated the feasibility and cost of moving towards a truly Safe System infrastructure. The key feature of such an infrastructure is that it be designed to preserve safety in the face of driver fallibility.
Australian National Risk Assessment Model
The Australian National Risk Assessment Model (ANRAM) helps road agencies identify fatal and serious injury (severe) crash risk across all parts of the road network. ANRAM helps road agencies manage this risk through development of treatment…
Model National Guidelines for Setting Speed Limits at High-risk Locations
This report incorporates recent research, best practice examples, and jurisdictional inputs to propose a set of model national speed limit guidelines for setting speed limits at high-risk locations. The model guidelines represent a harm reduction…
Investigation of Key Crash Types: Run-off-road and Head-on Crashes in Urban Areas: Final Report
This report collates research into factors contributing to the incidence and severity of run-off-road and head-on collisions on urban roads in Australia and New Zealand. It also identifies possible measures to reduce the incidence and severity of…
Improving the Performance of Safe System Infrastructure: Stage 1 Interim Report

This report summarises the findings from the first year of a three-year study which reviews the safety performance of road infrastructure elements identified as Safe System solutions. The first stage sought to identify these solutions and to…

Asset Management Within a Safe System
This report documents the outcomes of an Austroads project which considered the asset management implications of the new Safe System approach and investigated what implementing a Safe System would mean for asset managers. The report provides a…
Safe System Demonstration Project Involving an Indigenous Community: Implementation
This document reports on the implementation phase of the Indigenous Safe System Demonstration Project in Bidyadanga, Western Australia. In this phase a funding strategy was developed for the implementation plan which was prepared in the second half…