Sprayed Sealing – Calibration of Bitumen Sprayers
This Pavement Work Tip provides information on the essential elements of the calibration process for bitumen sprayers.
Sprayed Sealing – Selecting Aggregate Size
This Pavement Work Tip details the general principles affecting aggregate size selection and provides recommended aggregate sizes for a range of sealing treatments.
Sprayed Seals – Pre-spraying to Correct Surface Texture
This Pavement Work Tip outlines the procedure to allow for surface texture variations by pre-spraying of additional binder.
Sprayed Sealing – Minimising Handwork
This Pavement Work Tip provides instructions on how to minimise sprayed sealing handwork and gives some suggestions for maximising the use of a sprayer when sealing tapers and roundabouts.
Sprayed Seals – Aggregate Spread Rates and Spreader Calibration
This Pavement Work Tip describes the requirements for the selection of an appropriate design aggregate spread rate and the calibration of aggregate spreading equipment for uniformity and consistency of output.
Sprayed Sealing in Extremely Hot Weather
This Pavement Work Tip refers to minimising the risk of bleeding when carrying out sprayed sealing work during extreme hot weather events, especially when subject to slow moving or stationary heavy traffic, or unusually heavy loads.
Linked Work Tips Index
This linked index of the Pavement Work Tips is designed to help practitioners easily access the more than 50 publications in the Work Tips collection.
Webinar: 2022 Winners of the Austroads Bridge Awards
The webinar showcases the projects recognised with the Austroads Bridge Awards. The Austroads Bridge Awards acknowledge individuals and organisations that have delivered outstanding bridge structures and design across Australia and New Zealand. The…
The Benefits of Using InQuik Accelerated Bridge Construction Systems
The InQuik Bridge System is an Australian innovation that was first conceptualized in 2015. Since its introduction into the market in 2017, it has been rapidly adopted in the Australian bridge market, with more than 160+ bridges in service or under…
Simple visualisation of projects using 360 Pano camera views embedded in project GIS portal for design development and stakeholder consultation
Visualisation tools are often used during concept development to assist in developing feasible options and also for further consultation with stakeholders and other interested parties to gain approval for further progression of the project.…