Publications

Filter
Topic
Publication State
Showing 1 - 10 of 40 Publications
Webinar: Guide to Project Delivery Parts 2 and 3 Update
Two parts of the Austroads Guide to Project Delivery &ndash
Guide to Project Delivery Part 3: Contract Management
The Guide to Project Delivery consists of five parts. Part 3 is concerned with the procurement and management of road construction contracts. It covers in detail, key processes and procedures relating to documentation and contract administration. It…
Webinar: Procurement Decision Tool: A Case Study of the Toowoomba Second Range Crossing
This webinar, presented by Adrian Bridge on 31 July 2020, provides an overview of a new procurement decision tool and its application to a road infrastructure project, the Toowoomba Second Range Crossing (TSRC) in Queensland. The procurement…
Supply and Placement of Steel for the Reinforcement of Concrete
Austroads Technical Specification ATS 5310 sets out the requirements for the supply, fabrication, handling and placement of steel used for the reinforcement of concrete (&lsquo
Procurement Decision Tool: A Case Study of the Toowoomba Second Range Crossing
The procurement decision tool (&ldquo
Supply of Bolts, Nuts and Washers
Austroads Technical Specification ATS 5420 sets out the requirements for the supply of bolts, nuts, screws, washers, studbolts and threaded rods for steelwork. It also includes requirements for the supply of stainless steel fasteners. This…
Cementitious Patch Repair of Concrete
Austroads Technical Specification 5340 sets out the requirements for the patch repair of defective concrete using cementitious materials. The process of restoring existing concrete typically includes: breaking back to sound and dense concrete to…
General Conditions of Contract for Construction - National Capital Works 4 (NCW4)
General Conditions of Contract for Construction - National Capital Works 4 (NCW4) has been developed for use in “construct only” contracts where the principal is a government or semi-government agency.
Webinar: General Conditions of Contract for Construction - National Capital Works 4 (NCW4)
This webinar, presented on 25 July 2019, provides an overview of the new General Conditions of Contract for Construction - National Capital Works 4 (NCW4), released by Austroads and the Australian Procurement and Construction Council (APCC).
Fabrication and Erection of Structural Steelwork - The New AS/NZS 5131 and Engineers Risk Mitigation
This paper examines the initiative by the Australian Steel Institute to underwrite development of the new Australian Standard AS/NZS 5131 ‘Structural Steelwork – Fabrication and Erection’, the new ‘National Structural Steelwork Specification (NSSS)…