Publications

Filter
Topic
Publication State
Showing 1 - 10 of 63 Publications
Guide to Pavement Technology Part 2: Pavement Structural Design
Guide to Pavement Technology Part 2: Pavement Structural Design provides advice for the structural design of sealed road pavements. The advice has been generally developed from the approaches followed by the Austroads member agencies. However, as it…
Linked Work Tips Index
This linked index of the Pavement Work Tips is designed to help practitioners easily access the more than 50 publications in the Work Tips collection.
Road Tunnel Wall Panels and Finishes: Best Practice Approaches
This report documents the best practice approaches for the use of road tunnel wall panels and finishes, which informed the development of a specification framework. This was developed through a workshop with subject-matter experts, review of current…
Network Signage for Over Height Vehicles Approaching Road Tunnels
This report, originally published in November 2021, outlines the findings of a project to develop clearer and more consistent tunnel signage to reduce the impact of over-dimensioned and dangerous goods vehicles on both infrastructure and Workplace…
Webinar: Guide to Road Tunnels Part 2 Update: Rationalising Network Signage for Over-height Vehicles
A recently completed project has recommended changes to the Austroads Guide to Road Tunnels Part 2: Planning, Design and Commissioning to provide guidance on rationalising road signs on the approaches to tunnels, to divert over-height and dangerous…
Asphalt Joints
This Pavement Work Tip details techniques to ensure that joints in asphalt do not create a point of weakness due to poor compaction and that correct shape and ride quality are maintained.
Sprayed Sealing – Uniformity and Neatness
This Work Tip details work practices that help ensure uniformity of Binder Application Rates and neatness of joints in sprayed seals.
Sprayed Sealing – Joint Locations and Effect on Binder Application Rates
This Pavement Work Tip considers traffic distribution and its effect on the suitable location of joints and where the design Binder Application Rates should be varied to allow for the expected traffic volume.
Webinar: Austroads Project Pipeline 2021-22
This webinar provides an overview of Austroads&rsquo
Webinar: Paving Our Ways
This webinar presents a book &ldquo