Publications

Showing 1 - 3 of 3 Publications
Sprayed Sealing: Volume Binder Correction
This Pavement Work Tip provides a guide to calculate the volume of liquid bituminous binders relative to a standard temperature of 15°C.
Salinity and Rising Water Tables: Risks for Road Assets
This report documents work undertaken in relation to the Austroads Business Systems Project BS.A.N.523 Salinity and Rising Water-Tables - Risks for Network Asset management. The purpose of the project was to identify the potential impact of dryland…
Sprayed Seal Design 2003/04: Summary
The report summarises the activity in the Austroads sprayed seal design project for 2003/2004. Austroads member authorities were surveyed to determine if there were further issues with sprayed seal design that needed resolution. Recommendations for…