Skip navigation
Open main navigation
Open/Close Search bar
Search
View Cart
Drivers & Vehicles
Toggle
Drivers & Vehicles
This section includes managing drivers with health risks, requirements for visiting drivers, NEVDIS, and the introduction of connected and automated vehicles to Australasia.
Assessing Fitness to Drive
Vehicles and Technology
NEVDIS
Overseas Drivers
Registration and Licensing
Road Safety & Design
Toggle
Road Safety & Design
This section covers safety barrier assessments, and the work of the Road Safety Task Force and Road Design Task Force.
Barrier Assessment
Road Safety
Road Design
Safety Hardware Training and Accreditation Scheme (ASHTAS)
Transport Operations
Toggle
Transport Operations
In this section you'll find information about our work to improve the efficient, reliable and safe operation of the road network for all road users.
Network Operations
Traffic Management
Temporary Traffic Management
Freight
Active Travel
Transport Infrastructure
Toggle
Transport Infrastructure
This section includes information about strategic asset management, the management of bridges, pavements and tunnels, project delivery and the national prequalification system.
Asset Management
Bridges
National Prequalification
Pavements
Project Delivery
Road Tunnels
Technical Specifications
About
Contact
News
Events
Projects
Publications
Tenders
Login
Home
Publications
Publications
Share
Subject area
All
Bridges
Search publications library
Filter
Open/Close All Filters
Type
Type
Conference Papers
16
Research Reports
1
Topic
Topic
Annual reports
18
Asphalt
20
Bicycles
23
Binders
20
Binders test methods
18
Bitumen
20
Bridge assessment
35
Bridge barriers
Bridge components
22
Bridge construction
43
Bridge design
62
Bridge maintenance
33
Bridge management
Bridge materials
32
Bridge performance
24
Capability assessment
18
Concrete
30
Cooperative ITS
18
Crash analysis
19
Data management
22
Driver licensing
18
Economic evaluation
20
Fibre reinforced polymer
17
Financing
18
Freight policy
18
Geotextiles
18
Granular materials
18
Heavy vehicle access
23
Heavy vehicle safety
19
Intelligent transport systems
20
Intersection design
18
Logistics
18
Materials testing
29
Motorcycles
18
Network management
18
Network performance
17
Pavement construction
18
Pavement design
27
Pavement management
27
Pavement performance
33
Pedestrians
22
Performance based standards
18
Prequalification
18
Process and documentation
19
Procurement
21
Project governance
19
Project planning
19
Rail bridges
26
Risk assessment
18
Roadside design
19
Rural and remote
19
Safe people
18
Safe roads
21
Safe System
19
Safety strategy
19
Seals
26
Smart motorways
19
Speed management
19
Steel
20
Strategic asset management
19
Structures management
21
Timber
19
Traffic operations
18
Waterway design
17
Year
Year
2024
19
2023
18
2022
42
2021
19
2018
18
2017
42
2015
18
2014
2013
18
2012
18
2011
62
2004
19
2002
19
1998
18
Publication State
Publication State
Live
Sort by:
Relevance
Date (Newest first)
Date (Oldest first)
Title (A-Z)
Title (Z-A)
Publication Code (A-Z)
Publication Code (Z-A)
Showing 1 - 10 of 17 Publications
Bridge barriers
Remove Bridge barriers filter
Bridge management
Remove Bridge management filter
2014
Remove 2014 filter
Live
Remove Live filter
Clear all filters
Clear all filters
Fully-matching results
Sustainable Management of Installation of Impressed Current Cathodic Protection Systems for Bridges of the Future
ABC-LCM104-14
22 Oct 2014
Bridges
More
The role of effective project/contract management in the successful delivery of Impressed Current Cathodic Protection (ICCP) systems has been recognised by RMS specification for ICCP, BS361, which has comprehensive provisions for the supervision of…
Incorporating ACI 440.8 into AS 5100.5 for FRP Strengthening Via M80 Upgrade Project Case Study
ABC-DES203-14
22 Oct 2014
Bridges
More
As bridges age and standards evolve, it has become increasingly necessary to strengthen existing bridges as a much cheaper option than replacing bridges as a whole.
Strategic Review of Flood Impact on Victorian Structures
ABC-LCM303-14
22 Oct 2014
Bridges
More
Victoria has experienced a number of large-scale and intense flood events in the last four years. An assessment has been undertaken of the structures impacted by these flood events.The objective was to better understand the impact of the floods on…
Flood Resilient Bridge Design, Case Studies from Challenging Design Environments
ABC-LCM103-14
22 Oct 2014
Bridges
More
Case studies of bridges located in the Lockyer Valley in Queensland and the Solomon Islands are presented in the paper. Historically these locations have experienced extreme flooding. Flood damage at bridges can isolate communities and result in…
Proposed Methodology for Upgrading Bridge Barriers
ABC-MAR104-14
22 Oct 2014
Bridges
More
The AS 5100 Standard provides requirements for multiple-performance-level barriers. Historical barriers constructed before 1970 generally do not meet modern requirements for safety. This paper builds on ongoing previous research projects within…
Life-cycle Management of Bridges: What is the Best Approach?
ABC-LCM201-14
22 Oct 2014
Bridges
More
A key element of optimised asset management involves determining the type and timing of maintenance and renewals actions to achieve the least whole-of-life cost. This can often be a very complex process in reality because of the many different…
Building Bridges: Building Communities
ABC-LCM301-14
22 Oct 2014
Bridges
More
The paper focuses on the urban design aspects of bridge infrastructure, recognising the importance bridges have in our communities and the often overlooked social responsibility bridge builders have when undertaking such projects.Using examples from…
Auckland Harbour Bridge Painting: Development of a Future Maintenance Strategy
ABC-LCM101-14
22 Oct 2014
Bridges
More
The Auckland Harbour Bridge (AHB), built in 1959 and widened in 1969, has some 125,000 m2 of external steel surfaces which have been maintained using a patch and recoat philosophy. This has been carried out since 1998 by Total Bridge Services…
West Gate Bridge: Management of Fatigue Cracking
ABC-CAS104-14
22 Oct 2014
Bridges
More
Melbournes 2.5 km long West Gate Bridge includes an 848 m long steel box girder portion, over the Yarra River, comprising cable-stayed spans and an orthotropic steel deck. As with other similar bridges throughout the world, the steel spans of the…
What next for bridges?
ABC-IAR102-14
22 Oct 2014
Bridges
More
Bridge design is an ancient art. The principles for overcoming gravity, supporting people and vehicles and the best use of the materials at hand have evolved but are rooted in antiquity. In contrast with this stability we are perhaps going through…
1
2
Next
Latest news
13 May 2024
Austroads and AfPA update bituminous binder sampling practice guidelines
9 May 2024
Neil Scales honoured with Austroads Medal for transformational leadership
6 May 2024
Congratulations to Madeleine McManus OAM on receiving 2024 John Shaw Medal
Sign up for our monthly newsletter RoadWatch Roundup
Name
Email
Hide Feedback button
Feedback
Close
Feedback form
Name
Email
Repeat email address
Telephone
What type of feedback would you like to leave?
Select…
Compliment
Complaint
Suggestion
Feedback text area...
Would you like a response?
Yes
No