Skip navigation
Open main navigation
Open/Close Search bar
Search
View Cart
Drivers & Vehicles
Toggle
Drivers & Vehicles
This section includes managing drivers with health risks, requirements for visiting drivers, NEVDIS, and the introduction of connected and automated vehicles to Australasia.
Assessing Fitness to Drive
Vehicles and Technology
NEVDIS
Overseas Drivers
Registration and Licensing
Road Safety & Design
Toggle
Road Safety & Design
This section covers safety barrier assessments, and the work of the Road Safety Task Force and Road Design Task Force.
Barrier Assessment
Road Safety
Road Design
Safety Hardware Training and Accreditation Scheme (ASHTAS)
Transport Operations
Toggle
Transport Operations
In this section you'll find information about our work to improve the efficient, reliable and safe operation of the road network for all road users.
Network Operations
Traffic Management
Temporary Traffic Management
Freight
Active Travel
Transport Infrastructure
Toggle
Transport Infrastructure
This section includes information about strategic asset management, the management of bridges, pavements and tunnels, project delivery and the national prequalification system.
Asset Management
Bridges
National Prequalification
Pavements
Project Delivery
Road Tunnels
Technical Specifications
About
Contact
News
Events
Projects
Publications
Tenders
Login
Home
Publications
Publications
Share
Subject area
All
Bridges
Search publications library
Filter
Open/Close All Filters
Type
Type
Conference Papers
53
Topic
Topic
Annual reports
54
Asphalt
56
Bicycles
58
Binders
56
Binders test methods
54
Bitumen
56
Bridge assessment
65
Bridge barriers
55
Bridge components
56
Bridge construction
Bridge design
79
Bridge maintenance
Bridge management
57
Bridge materials
66
Bridge performance
62
Capability assessment
54
Concrete
65
Cooperative ITS
54
Crash analysis
55
Data management
58
Driver licensing
54
Economic evaluation
56
Fibre reinforced polymer
53
Financing
54
Freight policy
54
Geotextiles
54
Granular materials
54
Heavy vehicle access
57
Heavy vehicle safety
55
Intelligent transport systems
56
Intersection design
54
Logistics
54
Materials testing
65
Motorcycles
54
Network management
54
Network performance
54
Pavement construction
54
Pavement design
63
Pavement management
63
Pavement performance
69
Pedestrians
57
Performance based standards
54
Prequalification
54
Process and documentation
55
Procurement
57
Project governance
55
Project planning
55
Rail bridges
56
Risk assessment
54
Roadside design
55
Rural and remote
55
Safe people
54
Safe roads
57
Safe System
55
Safety strategy
55
Seals
62
Smart motorways
55
Speed management
55
Steel
55
Strategic asset management
55
Structures management
58
Timber
54
Traffic operations
54
Waterway design
53
Year
Year
2023
54
2022
126
2021
57
2020
58
2018
54
2017
106
2016
54
2014
2012
54
2011
109
2003
54
2002
54
2001
54
2000
55
Publication State
Publication State
Live
Sort by:
Relevance
Date (Newest first)
Date (Oldest first)
Title (A-Z)
Title (Z-A)
Publication Code (A-Z)
Publication Code (Z-A)
Showing 1 - 10 of 53 Publications
Bridge construction
Remove Bridge construction filter
Bridge maintenance
Remove Bridge maintenance filter
2014
Remove 2014 filter
Live
Remove Live filter
Clear all filters
Clear all filters
Fully-matching results
Westgate Footbridge, Auckland New Zealand
ABC-DES802-14
22 Oct 2014
Bridges
More
The Westgate footbridge provides a new pedestrian and cyclist connection across four carriageways of State Highway 16 near the Westgate Shopping Centre in Auckland, NZ. The bridge is 3 m wide and consists of three separate structures
Evaluation and Strengthening of Existing Bridges to Carry Increased Vehicle Weights
ABC-AAI405-14
22 Oct 2014
Bridges
More
Detailed investigation and live-load evaluation was undertaken for several 1930s reinforced concrete bridges followed by strengthening where required.
Sustainable Management of Installation of Impressed Current Cathodic Protection Systems for Bridges of the Future
ABC-LCM104-14
22 Oct 2014
Bridges
More
The role of effective project/contract management in the successful delivery of Impressed Current Cathodic Protection (ICCP) systems has been recognised by RMS specification for ICCP, BS361, which has comprehensive provisions for the supervision of…
Engineering Challenges of Strengthening and Underpinning Existing Bridges: M80 Ring Road Upgrade, Victoria
ABC-DES201-14
22 Oct 2014
Bridges
More
The M80 Ring Road Upgrade is a road project by VicRoads to improve the 38 km freeway extending from Laverton North to Greensborough. The contractor is Fulton Hogan and KBR is the lead designer for the detailed design of a section between Edgars Road…
Design and Construction of Omega Bridge Gerringong
ABC-CAS201-14
22 Oct 2014
Bridges
More
The Gerringong upgrade is the first of the three sections of the Princes Highway upgrade between Gerringong and Bomaderry on the South Coast of New South Wales. Roads and Maritime Services contracted Fulton Hogan to design and construct the…
Steel Truss Road Bridges on Regional Rail Link
ABC-DES103-14
22 Oct 2014
Bridges
More
As part of the Footscray to Deer Park section of the Regional Rail Link project in Melbourne, major road bridge replacements were constructed at Nicholson Street and Albert Street. Both bridges span over the widened rail corridor.The available…
Improving Victoriaâs Rail Network Through Innovative Structural Design
ABC-DES601-14
22 Oct 2014
Bridges
More
The Regional Rail Link is a $4.8 billion, joint Commonwealth and Victorian Government funded infrastructure project designed to remove major bottlenecks in Victorias rail network by separating regional and metropolitan trains as they travel from…
Regional Rail Link Deer Park to West Werribee Junction, Road Bridges, Victoria
ABC-DES101-14
22 Oct 2014
Bridges
More
The Regional Rail Link (RRL) project is Victorias largest rail infrastructure project providing 47.5 km of new dual railway tracks for dedicated V/Line regional rail services between Southern Cross Station and West Werribee Junction via Sunshine…
Incorporating ACI 440.8 into AS 5100.5 for FRP Strengthening Via M80 Upgrade Project Case Study
ABC-DES203-14
22 Oct 2014
Bridges
More
As bridges age and standards evolve, it has become increasingly necessary to strengthen existing bridges as a much cheaper option than replacing bridges as a whole.
The New AS 5100 Part 8: Rehabilitation and Strengthening
ABC-AUS202-14
22 Oct 2014
Bridges
More
AS 5100 was originally developed for the design of new bridges. There are however, approximately 20,000 existing bridges in Australia. Although Part 7 of the Standard relates to the strength rating of existing bridges, the existing AS 5100 generally…
1
2
3
4
5
Next
Latest news
21 May 2024
New report details findings of survey of medical practices and practitioners
13 May 2024
Austroads and AfPA update bituminous binder sampling practice guidelines
9 May 2024
Neil Scales honoured with Austroads Medal for transformational leadership
Sign up for our monthly newsletter RoadWatch Roundup
Name
Email
Hide Feedback button
Feedback
Close
Feedback form
Name
Email
Repeat email address
Telephone
What type of feedback would you like to leave?
Select…
Compliment
Complaint
Suggestion
Feedback text area...
Would you like a response?
Yes
No