Skip navigation
Open main navigation
Open/Close Search bar
Search
View Cart
Drivers & Vehicles
Toggle
Drivers & Vehicles
This section includes managing drivers with health risks, requirements for visiting drivers, NEVDIS, and the introduction of connected and automated vehicles to Australasia.
Assessing Fitness to Drive
Vehicles and Technology
NEVDIS
Overseas Drivers
Registration and Licensing
Road Safety & Design
Toggle
Road Safety & Design
This section covers safety barrier assessments, and the work of the Road Safety Task Force and Road Design Task Force.
Barrier Assessment
Road Safety
Road Design
Safety Hardware Training and Accreditation Scheme (ASHTAS)
Transport Operations
Toggle
Transport Operations
In this section you'll find information about our work to improve the efficient, reliable and safe operation of the road network for all road users.
Network Operations
Traffic Management
Temporary Traffic Management
Freight
Active Travel
Transport Infrastructure
Toggle
Transport Infrastructure
This section includes information about strategic asset management, the management of bridges, pavements and tunnels, project delivery and the national prequalification system.
Asset Management
Bridges
National Prequalification
Pavements
Project Delivery
Road Tunnels
Technical Specifications
About
Contact
News
Events
Projects
Publications
Tenders
Login
Home
Publications
Publications
Share
Subject area
All
Bridges
Materials
Pavement
Project Delivery
Search publications library
Filter
Open/Close All Filters
Type
Type
Conference Papers
15
Corporate Reports
1
Research Reports
2
Topic
Topic
Annual reports
19
Asphalt
21
Bicycles
24
Binders
21
Binders test methods
19
Bitumen
21
Bridge assessment
35
Bridge barriers
20
Bridge components
Bridge construction
42
Bridge design
61
Bridge maintenance
44
Bridge management
33
Bridge materials
25
Bridge performance
23
Capability assessment
19
Concrete
Cooperative ITS
19
Crash analysis
20
Data management
23
Driver licensing
19
Economic evaluation
21
Fibre reinforced polymer
20
Financing
19
Freight policy
19
Geotextiles
19
Granular materials
19
Heavy vehicle access
24
Heavy vehicle safety
20
Intelligent transport systems
21
Intersection design
19
Logistics
19
Materials testing
28
Motorcycles
19
Network management
19
Network performance
19
Pavement construction
19
Pavement design
26
Pavement management
28
Pavement performance
32
Pedestrians
23
Performance based standards
19
Prequalification
18
Process and documentation
20
Procurement
22
Project governance
20
Project planning
20
Rail bridges
27
Risk assessment
19
Roadside design
20
Rural and remote
20
Safe people
19
Safe roads
22
Safe System
20
Safety strategy
20
Seals
27
Smart motorways
20
Speed management
20
Steel
21
Strategic asset management
20
Structures management
22
Timber
20
Traffic operations
19
Waterway design
19
Year
Year
2023
23
2022
41
2021
22
2020
28
2019
20
2018
19
2017
57
2016
20
2014
2013
19
2012
20
2011
46
2010
19
2008
20
2004
19
2002
19
1998
19
Publication State
Publication State
Live
Sort by:
Relevance
Date (Newest first)
Date (Oldest first)
Title (A-Z)
Title (Z-A)
Publication Code (A-Z)
Publication Code (Z-A)
Showing 1 - 10 of 18 Publications
Bridge components
Remove Bridge components filter
Concrete
Remove Concrete filter
2014
Remove 2014 filter
Live
Remove Live filter
Clear all filters
Clear all filters
Fully-matching results
New Prequalification Categories Proposed: Steel Fabrication and Pre-cast Concrete Products
AP-C94-14
5 Nov 2014
Project Delivery
More
In late 2014 Austroads sought feedback on a proposal to add two new specialist categories to Australia’s National Prequalification System.
The Revision of AS 5100.4: Bearings and Deck Joints
ABC-AUS103-14
22 Oct 2014
Bridges
More
A major revision of AS 5100.4 Bearing and Deck Joints has been undertaken in preparation for the publication of a new edition of AS 5100. The major changes to Part 4 of the Standard include the introduction of provisions for modular deck joints and…
Proposed Revisions to AS 5100 Part 5: Concrete
ABC-AUS104-14
22 Oct 2014
Bridges
More
Since the introduction of the current Bridge Design Standard in 2004 there have been real advances in both design and construction methods and in materials technology. The Part 5 Standards Australia Sub-Committee (BD090-05) has responded to this…
Time-Variant Performance Indicators for Concrete Bridges Exposed to Corrosion
ABC-IAM102-14
22 Oct 2014
Bridges
More
The life-cycle performance of concrete bridges exposed to corrosion is investigated based on a set of time-variant probabilistic performance indicators including structural reliability, redundancy, robustness and resilience. The performance…
Long-Term Performance of Concrete Bridges Under Extreme Events
ABC-IAM101-14
22 Oct 2014
Bridges
More
Reinforced concrete (RC) structures in a marine environment deteriorate with time due to chloride-induced corrosion of reinforcing bars. Corrosion is initiated by chloride contamination if the structures have poor quality concrete and/or inadequate…
Inelastic Displacement-Based Seismic Design of Balanced Cantilever Bridges With Mid-Length Joints
ABC-DES604-14
22 Oct 2014
Bridges
More
Ideally, a balanced cantilever bridge is built with its superstructure continuous between the abutments. For long bridges, mid-length expansion joints may be necessary. The separation of expansion joints may be maximised by supporting the…
Influence of Placement Method on In-Place Hardened Properties Of Deep Foundation Using SCC
ABC-IAR103-14
22 Oct 2014
Bridges
More
The use of self-compacting concrete (SCC) in identified concrete bridge elements has now been incorporated in NSW Roads and Maritime Services QA Specifications B80 as Annexure B80/G. The use of SCC in precast elements is generally allowed while a…
Life-Cycle Management of Bridges Based on Robustness to Deterioration
ABC-IAM103-14
22 Oct 2014
Bridges
More
In this paper a framework for assessing the robustness of existing reinforced concrete structures under corrosion is presented. Robustness is defined as a structural property related to the tolerance to damage and is measured by the mean performance…
Experimental Testing of Emulative Connections for Accelerated Bridge Construction in Seismic Areas
ABC-CAS102-14
22 Oct 2014
Bridges
More
The use of precast concrete for construction of bridge substructures offers a number of advantages over the conventional use of cast in place (CIP) concrete. These advantages include increased construction speed and quality, minimised traffic…
Effect of Crack Control Measures in AS 5100.5 on Partially Prestressed Super-T Girder Bridges
ABC-SAS102-14
22 Oct 2014
Bridges
More
Australian bridge design code AS 5100.5 in Section 8.6.2 prescribes simplified criteria to meet the requirements for crack control applicable to a partially prestressed concrete beam. The incremental stress permitted in bonded reinforcement after…
1
2
Next
Latest news
13 May 2024
Austroads and AfPA update bituminous binder sampling practice guidelines
9 May 2024
Neil Scales honoured with Austroads Medal for transformational leadership
6 May 2024
Congratulations to Madeleine McManus OAM on receiving 2024 John Shaw Medal
Sign up for our monthly newsletter RoadWatch Roundup
Name
Email
Hide Feedback button
Feedback
Close
Feedback form
Name
Email
Repeat email address
Telephone
What type of feedback would you like to leave?
Select…
Compliment
Complaint
Suggestion
Feedback text area...
Would you like a response?
Yes
No