New Prequalification Categories Proposed: Steel Fabrication and Pre-cast Concrete Products
In late 2014 Austroads sought feedback on a proposal to add two new specialist categories to Australia’s National Prequalification System.
The Revision of AS 5100.4: Bearings and Deck Joints
A major revision of AS 5100.4 Bearing and Deck Joints has been undertaken in preparation for the publication of a new edition of AS 5100. The major changes to Part 4 of the Standard include the introduction of provisions for modular deck joints and…
Proposed Revisions to AS 5100 Part 5: Concrete
Since the introduction of the current Bridge Design Standard in 2004 there have been real advances in both design and construction methods and in materials technology. The Part 5 Standards Australia Sub-Committee (BD090-05) has responded to this…
Time-Variant Performance Indicators for Concrete Bridges Exposed to Corrosion
The life-cycle performance of concrete bridges exposed to corrosion is investigated based on a set of time-variant probabilistic performance indicators including structural reliability, redundancy, robustness and resilience. The performance…
Long-Term Performance of Concrete Bridges Under Extreme Events
Reinforced concrete (RC) structures in a marine environment deteriorate with time due to chloride-induced corrosion of reinforcing bars. Corrosion is initiated by chloride contamination if the structures have poor quality concrete and/or inadequate…
Inelastic Displacement-Based Seismic Design of Balanced Cantilever Bridges With Mid-Length Joints
Ideally, a balanced cantilever bridge is built with its superstructure continuous between the abutments. For long bridges, mid-length expansion joints may be necessary. The separation of expansion joints may be maximised by supporting the…
Influence of Placement Method on In-Place Hardened Properties Of Deep Foundation Using SCC
The use of self-compacting concrete (SCC) in identified concrete bridge elements has now been incorporated in NSW Roads and Maritime Services QA Specifications B80 as Annexure B80/G. The use of SCC in precast elements is generally allowed while a…
Life-Cycle Management of Bridges Based on Robustness to Deterioration
In this paper a framework for assessing the robustness of existing reinforced concrete structures under corrosion is presented. Robustness is defined as a structural property related to the tolerance to damage and is measured by the mean performance…
Experimental Testing of Emulative Connections for Accelerated Bridge Construction in Seismic Areas
The use of precast concrete for construction of bridge substructures offers a number of advantages over the conventional use of cast in place (CIP) concrete. These advantages include increased construction speed and quality, minimised traffic…
Effect of Crack Control Measures in AS 5100.5 on Partially Prestressed Super-T Girder Bridges