Skip navigation
Open main navigation
Open/Close Search bar
Search
View Cart
Drivers & Vehicles
Toggle
Drivers & Vehicles
This section includes managing drivers with health risks, requirements for visiting drivers, NEVDIS, and the introduction of connected and automated vehicles to Australasia.
Assessing Fitness to Drive
Vehicles and Technology
NEVDIS
Overseas Drivers
Registration and Licensing
Road Safety & Design
Toggle
Road Safety & Design
This section covers safety barrier assessments, and the work of the Road Safety Task Force and Road Design Task Force.
Barrier Assessment
Road Safety
Road Design
Safety Hardware Training and Accreditation Scheme (ASHTAS)
Transport Operations
Toggle
Transport Operations
In this section you'll find information about our work to improve the efficient, reliable and safe operation of the road network for all road users.
Network Operations
Traffic Management
Temporary Traffic Management
Freight
Active Travel
Transport Infrastructure
Toggle
Transport Infrastructure
This section includes information about strategic asset management, the management of bridges, pavements and tunnels, project delivery and the national prequalification system.
Asset Management
Bridges
National Prequalification
Pavements
Project Delivery
Road Tunnels
Technical Specifications
About
Contact
News
Events
Projects
Publications
Tenders
Login
Home
Publications
Publications
Share
Subject area
All
Bridges
Search publications library
Filter
Open/Close All Filters
Type
Type
Conference Papers
48
Topic
Topic
Annual reports
49
Asphalt
51
Bicycles
52
Binders
51
Binders test methods
49
Bitumen
51
Bridge assessment
65
Bridge barriers
49
Bridge components
50
Bridge construction
54
Bridge design
Bridge maintenance
73
Bridge management
61
Bridge materials
63
Bridge performance
57
Capability assessment
49
Concrete
61
Cooperative ITS
49
Crash analysis
50
Data management
53
Driver licensing
49
Economic evaluation
51
Fibre reinforced polymer
Financing
49
Freight policy
49
Geotextiles
49
Granular materials
49
Heavy vehicle access
53
Heavy vehicle safety
50
Intelligent transport systems
51
Intersection design
49
Logistics
49
Materials testing
60
Motorcycles
49
Network management
49
Network performance
49
Pavement construction
49
Pavement design
58
Pavement management
58
Pavement performance
64
Pedestrians
48
Performance based standards
49
Prequalification
49
Process and documentation
50
Procurement
52
Project governance
50
Project planning
50
Rail bridges
51
Risk assessment
49
Roadside design
50
Rural and remote
50
Safe people
49
Safe roads
52
Safe System
50
Safety strategy
50
Seals
57
Smart motorways
50
Speed management
50
Steel
51
Strategic asset management
50
Structures management
55
Timber
50
Traffic operations
49
Waterway design
49
Year
Year
2023
49
2022
116
2021
50
2018
53
2017
121
2016
50
2014
2013
49
2012
49
2011
122
2004
49
2003
49
2001
49
2000
50
Publication State
Publication State
Live
Sort by:
Relevance
Date (Newest first)
Date (Oldest first)
Title (A-Z)
Title (Z-A)
Publication Code (A-Z)
Publication Code (Z-A)
Showing 1 - 10 of 48 Publications
Bridge design
Remove Bridge design filter
Fibre reinforced polymer
Remove Fibre reinforced polymer filter
2014
Remove 2014 filter
Live
Remove Live filter
Clear all filters
Clear all filters
Fully-matching results
Westgate Footbridge, Auckland New Zealand
ABC-DES802-14
22 Oct 2014
Bridges
More
The Westgate footbridge provides a new pedestrian and cyclist connection across four carriageways of State Highway 16 near the Westgate Shopping Centre in Auckland, NZ. The bridge is 3 m wide and consists of three separate structures
The Revision of AS 5100.4: Bearings and Deck Joints
ABC-AUS103-14
22 Oct 2014
Bridges
More
A major revision of AS 5100.4 Bearing and Deck Joints has been undertaken in preparation for the publication of a new edition of AS 5100. The major changes to Part 4 of the Standard include the introduction of provisions for modular deck joints and…
Engineering Challenges of Strengthening and Underpinning Existing Bridges: M80 Ring Road Upgrade, Victoria
ABC-DES201-14
22 Oct 2014
Bridges
More
The M80 Ring Road Upgrade is a road project by VicRoads to improve the 38 km freeway extending from Laverton North to Greensborough. The contractor is Fulton Hogan and KBR is the lead designer for the detailed design of a section between Edgars Road…
Design and Construction of Omega Bridge Gerringong
ABC-CAS201-14
22 Oct 2014
Bridges
More
The Gerringong upgrade is the first of the three sections of the Princes Highway upgrade between Gerringong and Bomaderry on the South Coast of New South Wales. Roads and Maritime Services contracted Fulton Hogan to design and construct the…
Steel Truss Road Bridges on Regional Rail Link
ABC-DES103-14
22 Oct 2014
Bridges
More
As part of the Footscray to Deer Park section of the Regional Rail Link project in Melbourne, major road bridge replacements were constructed at Nicholson Street and Albert Street. Both bridges span over the widened rail corridor.The available…
Installation of Vehicle Restraint Systems (VRS) On Bridges
ABC-DES702-14
22 Oct 2014
Bridges
More
Loading on the bridge deck resulting from an impact into the attached vehicle restraint system (VRS) has become a key aspect of bridge design and for determining the compatibility between an existing bridge and a VRS. Incorrect calculation or…
Review of AS 5100.2: Design Loads
ABC-AUS102-14
22 Oct 2014
Bridges
More
AS 5100, the Australian Bridge Design Code, is currently under review. AS 5100.2, Design Loads, sets out the minimum design loads, forces and load effect for road, railway, pedestrian and bicycle bridges and other associated structures.The review of…
Safe Design: Robust and Practical Temporary Propping of Super-T Girders
ABC-DES402-14
22 Oct 2014
Bridges
More
As part of the Peninsula Link Project, the project contract documents required that the designer take responsibility for the design and documentation of temporary propping supports for precast girders to discharge their safe design responsibilities.…
Improving Victoriaâs Rail Network Through Innovative Structural Design
ABC-DES601-14
22 Oct 2014
Bridges
More
The Regional Rail Link is a $4.8 billion, joint Commonwealth and Victorian Government funded infrastructure project designed to remove major bottlenecks in Victorias rail network by separating regional and metropolitan trains as they travel from…
A New Vehicle Loading Standard for Road Bridges in New Zealand
ABC-SAS104-14
22 Oct 2014
Bridges
More
With the progressive increase in heavy vehicle loadings associated with improved transport vehicle technology, the current vehicle loading standard for the design of bridges in New Zealand, first introduced in 1972, may not be appropriate for use in…
1
2
3
4
5
Next
Latest news
21 May 2024
New report details findings of survey of medical practices and practitioners
13 May 2024
Austroads and AfPA update bituminous binder sampling practice guidelines
9 May 2024
Neil Scales honoured with Austroads Medal for transformational leadership
Sign up for our monthly newsletter RoadWatch Roundup
Name
Email
Hide Feedback button
Feedback
Close
Feedback form
Name
Email
Repeat email address
Telephone
What type of feedback would you like to leave?
Select…
Compliment
Complaint
Suggestion
Feedback text area...
Would you like a response?
Yes
No