Publications

Showing 1 - 3 of 3 Publications
Incorporating ACI 440.8 into AS 5100.5 for FRP Strengthening Via M80 Upgrade Project Case Study
As bridges age and standards evolve, it has become increasingly necessary to strengthen existing bridges as a much cheaper option than replacing bridges as a whole.
Namoi Floodplain Viaduct: Design of a 1 Km Rail Viaduct in a Remote Area for a 35-Year Design Life
The Boggabri Maules Creek Rail project will connect the existing Werris Creek to Mugindi railway line to the existing Boggabri Coal Mine and the new Maules Creek Coal Mine.The railway line will provide Boggabri Coal Mine with improved logistics,…
Characterisation and Performance Evaluation of Granular Bases Project: Pavement Construction Report

A new rut resistance approach based on the wheel-tracking test for unbound granular materials has been developed. The objective of the Austroads project TT1819 is to validate the wheel-tracker laboratory approach against large-scale Accelerated…