Publications

Showing 1 - 6 of 6 Publications
Incorporating ACI 440.8 into AS 5100.5 for FRP Strengthening Via M80 Upgrade Project Case Study
As bridges age and standards evolve, it has become increasingly necessary to strengthen existing bridges as a much cheaper option than replacing bridges as a whole.
Namoi Floodplain Viaduct: Design of a 1 Km Rail Viaduct in a Remote Area for a 35-Year Design Life
The Boggabri Maules Creek Rail project will connect the existing Werris Creek to Mugindi railway line to the existing Boggabri Coal Mine and the new Maules Creek Coal Mine.The railway line will provide Boggabri Coal Mine with improved logistics,…
Guide to Project Delivery Part 1: Overview
The Guide to Project Delivery consists of five parts. Part 1 explains the context of project delivery in relation to the asset management functions and strategic planning process and its role and importance within the overall project management…
Building and Construction Procurement Guide: Principles and Options
Austroads and the Australasian Procurement and Construction Council's (APCC) 
Development of the Building and Construction Procurement Guide

This report presents the outcomes of the harmonisation work undertaken by Austroads and the Australasian Procurement and Construction Council to develop AP-G92-14 Building and Construction Procurement Guide – Principles and Optionswhich, if adopted…

Procurement of ITS (International Practice)
This report documents the findings from investigation of international ITS procurement practices through a literature review, case studies and interviews with stakeholders. A total of 14 case studies from six selected countries namely the US, UK,…