Publications

Showing 1 - 3 of 3 Publications
Incorporating ACI 440.8 into AS 5100.5 for FRP Strengthening Via M80 Upgrade Project Case Study
As bridges age and standards evolve, it has become increasingly necessary to strengthen existing bridges as a much cheaper option than replacing bridges as a whole.
Namoi Floodplain Viaduct: Design of a 1 Km Rail Viaduct in a Remote Area for a 35-Year Design Life
The Boggabri Maules Creek Rail project will connect the existing Werris Creek to Mugindi railway line to the existing Boggabri Coal Mine and the new Maules Creek Coal Mine.The railway line will provide Boggabri Coal Mine with improved logistics,…
Assessment of the Effectiveness of On-road Bicycle Lanes at Roundabouts in Australia and New Zealand
This report documents the research undertaken for Austroads on bicycle lanes at roundabouts. An extensive literature review informed empirical data gathering.The literature review revealed strong evidence that bicycle lanes on the approach and…