Publications

Showing 1 - 3 of 3 Publications
Incorporating ACI 440.8 into AS 5100.5 for FRP Strengthening Via M80 Upgrade Project Case Study
As bridges age and standards evolve, it has become increasingly necessary to strengthen existing bridges as a much cheaper option than replacing bridges as a whole.
Namoi Floodplain Viaduct: Design of a 1 Km Rail Viaduct in a Remote Area for a 35-Year Design Life
The Boggabri Maules Creek Rail project will connect the existing Werris Creek to Mugindi railway line to the existing Boggabri Coal Mine and the new Maules Creek Coal Mine.The railway line will provide Boggabri Coal Mine with improved logistics,…
Review of Axle Spacing Mass Schedules and Future Framework for Assessment of Heavy Vehicle Access Applications
A key component to improving freight productivity in Australia is to improve access to the network for heavy vehicle operators. Assessment of bridge capacity is perceived to be critical to this aim.