Publications

Filter
Publication State
Showing 1 - 9 of 9 Publications
The Revision of AS 5100.4: Bearings and Deck Joints
A major revision of AS 5100.4 Bearing and Deck Joints has been undertaken in preparation for the publication of a new edition of AS 5100. The major changes to Part 4 of the Standard include the introduction of provisions for modular deck joints and…
Inelastic Displacement-Based Seismic Design of Balanced Cantilever Bridges With Mid-Length Joints
Ideally, a balanced cantilever bridge is built with its superstructure continuous between the abutments. For long bridges, mid-length expansion joints may be necessary. The separation of expansion joints may be maximised by supporting the…
Anzac Cable Stayed Bridge Health Monitoring
Roads and Maritime Services of Transport for NSW in collaboration with the Bridge Solution Alliance formed by Freyssinet, Lend Lease and Sage Automation undertook a major maintenance project to solve stay cable vibrations, strengthening-related…
Modular Joint Testing for the Hunter Expressway
Modular bridge expansion joints (MBEJs) are widely used throughout the world for the provision of controlled pavement continuity during seismic, thermal expansion, contraction and long-term creep and shrinkage movements of bridge superstructures.…
West Gate Bridge: Refurbishment of Demag Expansion Joint and Roller Bearings
Melbourne’s West Gate Bridge, first opened to traffic in 1978, is around 2.5 km long and comprises an 848 m long five-span steel box girder portion over the Yarra River and two continuous concrete box girder approach viaducts 871 m and 670 m long.…
Providing for Road User Error in the Safe System
This project investigated the feasibility and cost of moving towards a truly Safe System infrastructure. The key feature of such an infrastructure is that it be designed to preserve safety in the face of driver fallibility.
Model National Guidelines for Setting Speed Limits at High-risk Locations
This report incorporates recent research, best practice examples, and jurisdictional inputs to propose a set of model national speed limit guidelines for setting speed limits at high-risk locations. The model guidelines represent a harm reduction…
Improving Roadside Safety: Summary Report
This report presents road safety engineering practitioners in Australia and New Zealand with updated advice on hazard management, treatment selection and barrier placement in a Safe System context. Roadside hazards pose a major risk to the occupants…
Improving Roadside Safety: Stage 4: Interim Report
Roadside hazards pose a major risk to the occupants of vehicles which run off the road. This report presents the final stage of an Austroads project which involved investigations into the effectiveness of safety barrier placement, providing more…