Publications

Showing 1 - 4 of 4 Publications
Incorporating ACI 440.8 into AS 5100.5 for FRP Strengthening Via M80 Upgrade Project Case Study
As bridges age and standards evolve, it has become increasingly necessary to strengthen existing bridges as a much cheaper option than replacing bridges as a whole.
Namoi Floodplain Viaduct: Design of a 1 Km Rail Viaduct in a Remote Area for a 35-Year Design Life
The Boggabri Maules Creek Rail project will connect the existing Werris Creek to Mugindi railway line to the existing Boggabri Coal Mine and the new Maules Creek Coal Mine.The railway line will provide Boggabri Coal Mine with improved logistics,…
Development of Guide Content on Managed Motorways
This report formulates content for the Austroads Guides on managed motorways. The majority of the content has been adopted from the VicRoads Managed Freeways: Freeway Ramp Signals Handbook (2010 and updated version 2013) and the VicRoads Managed…
Operational Management of Arterial/Managed Motorway Interfaces for Network Optimisation
Signalised interchanges and ramp metering are major components of the interface between the arterial road system and the motorway system. The control systems of motorways and arterials are often treated as separate control components, which can…