This report details the first year of a three-year Austroads project to transfer French Enrobés à Module Élevé Class 2 (EME2) technology to Australia. EME2 technology offers the prospect of reduced asphalt thicknesses for heavy duty pavements, and…
There is a need to improve the Austroads procedures for the mix and structural designs of foamed bitumen stabilised materials.
This progress report summarises the mix design test methods drafted to date and those planned for 2014-15 within the…
This report describes inspections conducted on double/double primerseals constructed in Victoria.
It is not typical practice to use two-layer primerseals, or polymer modification in primerseals, and methods to do so are not described by Austroads…