Publications

Filter
Publication State
Showing 1 - 10 of 11 Publications
Validation of Revised Austroads Sprayed Seal Design Approaches: Site Inspection

This report details investigations that were conducted to verify the new Austroads sprayed seal design guidelines.

To verify the appropriateness of the proposed basic voids factor (Vf), and the initial sealing design approach (and also to validate…

Development of a Sprayed Seal Binder Cracking Test

This report describes research into development of a laboratory sprayed seal binder cracking test which can be used to measure the relative fatigue cracking resistance of thin binder films which have thicknesses comparable to the thicknesses of the…

Improved Laboratory Characterisation of the Deformation Properties of Granular Materials

This report examines the capacity of the extra-large wheel-tracking laboratory test method to predict the in-service performance of granular materials.

Rutting is a common distress mode of unbound granular bases under thin bituminous surfacings.

Five…

High Modulus High Fatigue Resistance Asphalt (EME2) Technology Transfer: Final Report

EME2 mixes are produced using a hard paving grade bitumen applied at a high binder content (approximately 6%). Compared to conventional asphalt bases with unmodified binders, EME2 asphalt is characterised by high stiffness, high durability, superior…

Austroads LTPP/LTPPM Study - Summary Report 2015-16

This report provides a summary of activities completed during 2015–16 for the Austroads long term pavement performance monitoring project.

Austroads has funded the long-term pavement performance study since late 1994. The project monitors the…

Beyond Data Collection: Bridge Inspections in the Digital Age
Collecting, processing, and administering data from bridge inspections underpins bridge lifecycle management. Although, the inspection process and identification of material defects is well defined and documented, little guidance is given on systems…
Angellala Creek Bridge: Explosion to Bridge Reconstruction with a BIM Future
On the night of 5th September 2014 a road-train transporting 52 tonnes of ammonium nitrate crashed next to the Angellala Creek Bridge. The bridge is approximately 30km south of Charleville, on the Mitchell Highway in outback Queensland. The incident…
Innovative Bridge Pier Solution To Reduce Risks Associated with Construction Adjacent to Railway
Roads and Maritime Services New South Wales (NSW) is currently undertaking an $84 million project to upgrade the Pacific Highway and Wyong Road Intersection at Tuggerah on the NSW Central Coast. The project involves conversion of an existing…
Elizabeth Quay Pedestrian Bridge, Perth
Arup drew upon its local and global engineering skills and design excellence to develop and deliver a key focal point of Perth’s prestigious new waterfront development, Elizabeth Quay, to our client, MRA’s, delight and widespread acclaim. A key…
Digital Evolution of Bridge Management Systems in the Gulf Region
We are living in a world which has an ever-increasing amount of digitisation: people sip their cappuccinos while reading the Saturday paper on a tablet, university students stream lectures to their laptops without ever setting foot on campus,…