Publications

Filter
Publication State
Showing 1 - 7 of 7 Publications
Webinar: Guide to Traffic Management Part 13: Road Environment Safety (2017 Edition)
This webinar, presented on 16 November 2017, provides an overview of the key changes to the Guide to Traffic Management Part 13, such as updated information on driver workload and the Safe System, and incorporation of a discussion on human factors.…
Validation of Revised Austroads Sprayed Seal Design Approaches: Site Inspection

This report details investigations that were conducted to verify the new Austroads sprayed seal design guidelines.

To verify the appropriateness of the proposed basic voids factor (Vf), and the initial sealing design approach (and also to validate…

Development of a Sprayed Seal Binder Cracking Test

This report describes research into development of a laboratory sprayed seal binder cracking test which can be used to measure the relative fatigue cracking resistance of thin binder films which have thicknesses comparable to the thicknesses of the…

Improved Laboratory Characterisation of the Deformation Properties of Granular Materials

This report examines the capacity of the extra-large wheel-tracking laboratory test method to predict the in-service performance of granular materials.

Rutting is a common distress mode of unbound granular bases under thin bituminous surfacings.

Five…

High Modulus High Fatigue Resistance Asphalt (EME2) Technology Transfer: Final Report

EME2 mixes are produced using a hard paving grade bitumen applied at a high binder content (approximately 6%). Compared to conventional asphalt bases with unmodified binders, EME2 asphalt is characterised by high stiffness, high durability, superior…

Safety at Road Worksites: Stage 1 Working Papers
This report details contemporary practices to mitigate risk and improve safety at road worksites.
Austroads LTPP/LTPPM Study - Summary Report 2015-16

This report provides a summary of activities completed during 2015–16 for the Austroads long term pavement performance monitoring project.

Austroads has funded the long-term pavement performance study since late 1994. The project monitors the…