Skip navigation
Open main navigation
Open/Close Search bar
Search
View Cart
Drivers & Vehicles
Toggle
Drivers & Vehicles
This section includes managing drivers with health risks, requirements for visiting drivers, NEVDIS, and the introduction of connected and automated vehicles to Australasia.
Assessing Fitness to Drive
Vehicles and Technology
NEVDIS
Overseas Drivers
Registration and Licensing
Road Safety & Design
Toggle
Road Safety & Design
This section covers safety barrier assessments, and the work of the Road Safety Task Force and Road Design Task Force.
Barrier Assessment
Road Safety
Road Design
Safety Hardware Training and Accreditation Scheme (ASHTAS)
Transport Operations
Toggle
Transport Operations
In this section you'll find information about our work to improve the efficient, reliable and safe operation of the road network for all road users.
Network Operations
Traffic Management
Temporary Traffic Management
Freight
Active Travel
Transport Infrastructure
Toggle
Transport Infrastructure
This section includes information about strategic asset management, the management of bridges, pavements and tunnels, project delivery and the national prequalification system.
Asset Management
Bridges
National Prequalification
Pavements
Project Delivery
Road Tunnels
Technical Specifications
About
Contact
News
Events
Projects
Publications
Tenders
Login
Home
Publications
Publications
Share
Subject area
All
Bridges
Materials
Pavement
Project Delivery
Test Methods and Specifications
Search publications library
Filter
Open/Close All Filters
Type
Type
Conference Papers
42
Research Reports
3
Specifications
5
Technical Reports
3
Webinars
2
Topic
Topic
Active travel
56
Bicycles
67
Bridge assessment
143
Bridge barriers
65
Bridge components
112
Bridge construction
203
Bridge design
321
Bridge maintenance
157
Bridge management
167
Bridge materials
120
Bridge performance
113
Bridgeworks specifications
75
Cemented materials
57
Climate change
57
Concrete
Data management
56
Digital engineering (BIM)
62
Economic evaluation
56
Fibre reinforced polymer
62
Heavy vehicle access
72
Heavy vehicle weighing
57
Level of service
57
Materials testing
57
Network management
57
Network performance
56
Pedestrians
75
Performance based standards
58
Project governance
59
Public transport
57
Rail bridges
86
Recycled material
56
Road pricing
56
Rural and remote
59
Steel
76
Structure management
57
Structures management
80
Timber
61
Traffic controls
57
Waterway design
62
Year
Year
2020
5
2019
2
2018
1
2017
22
2016
2
2014
10
2011
11
2004
1
1998
1
Publication State
Publication State
Archived
1
Live
Sort by:
Relevance
Date (Newest first)
Date (Oldest first)
Title (A-Z)
Title (Z-A)
Publication Code (A-Z)
Publication Code (Z-A)
Showing 21 - 30 of 55 Publications
Bridges
Remove Bridges filter
Concrete
Remove Concrete filter
Live
Remove Live filter
Clear all filters
Clear all filters
Fully-matching results
Structural and Risk Assessment of Steel and Concrete Bridges using Inservice Dynamic Response
ABC2017-059-17
21 Apr 2017
Bridges
More
Mainmark are introducing the STRAAM system of full scale structural integrity assessment and continuous monitoring for Bridges into Australia and New Zealand. Advances in measuring extremely low amplitude vibrations combined with methods for…
Ambitions, Durability Risks and Asset Protection: Literature Review and Learning from Relevant Cases of Existing Bridge Structures
ABC2017-051-17
21 Apr 2017
Bridges
More
All reinforced concrete structures deteriorate over time. Corrosion of reinforcement is a major challenge to the durability of concrete structures. Corrosion in certain environments, such as marine, can compromise the durability of concrete and…
Reliability-Based Increases to Capacity Reduction Factors for Australian Standards AS3600 and AS5100
ABC2017-091-17
21 Apr 2017
Bridges
More
Capacity reduction factors (?) for flexure, shear and axial loadings are derived for reinforced and prestressed concrete structures based on a reliability-based calibration of the Australian Concrete Structures Standard AS3600. The structural…
Improving Corrosion Resistance of Reinforced Concrete Structures Using Carbon Fibre Reinforced Polymer
ABC2017-002-17
20 Apr 2017
Bridges
More
Corrosion of steel is regarded as one of the most important issues for the durability of reinforced concrete (RC) structures, as corrosion can induce the serviceability decrease, bond strength dropping, steel properties reduction, and longitudinal…
Chloride Ingress and Steel Corrosion in Slag and Fly Ash Blended Geopolymer Concrete
ABC2017-028-17
20 Apr 2017
Bridges
More
Alkali activated binders (geopolymer) is an emerging technology to produce concrete without the use of any Ordinary Portland Cement (OPC) by alkali activation of alumino-silicate source materials such as fly ash and/or slag. Limited knowledge on…
Establishing Positive Moment Continuity in Prestressed Concrete Girder Bridges: Performance and Lessons Learned
ABC2017-019-17
20 Apr 2017
Bridges
More
Structural health monitoring (SHM) is employed to evaluate a prestressed concrete bridge continuity detail in a newly constructed bridge in Louisiana. The detail is capable of resisting positive continuity moments that develop due to long-term and…
Investigation the Influence of FRP Application Performance on Fatigue Life Behavior of CFRP Laminates Bonded to Concrete Block
ABC2017-018-17
20 Apr 2017
Bridges
More
In this paper, two methods of FRP applications were carried out to study the fatigue life performance of CFRP laminates bonded to RC concrete block, by mean of investigating the influence of bond behavior application under cyclic loadings.
Precast Segmental Box Girder Design and Construction within a Constrained Rail Corridor
ABC2017-033-17
20 Apr 2017
Bridges
More
The Level Crossing Removal Project: Caulfield to Dandenong involves the removal of nine of Melbourne’s most congested level crossings along the Caulfield to Dandenong rail corridor. Grade separation of the four level crossings between Caulfield and…
ABC2017-003-17
ABC2017-003-17
20 Apr 2017
Bridges
More
Munna Point Bridge was built in Noosa Heads, Queensland in the late 1970s. Over 1.8 million trips in each direction are made across the 106 metre bridge every year, by tourists and locals. The bridge is one of only two routes to reach the primary…
Ensuring Quality and Durability in Concrete Construction for Major Infrastructure
ABC2017-046-17
20 Apr 2017
Bridges
More
A high level of quality during construction is a fundamental requirement to ensuring that a concrete structure performs its intended purpose and achieves its 100 year design life with minimal maintenance. To this end contractors must control the…
Prev
1
2
3
4
5
Next
Latest Bridges news
10 Apr 2024
12th Austroads Bridge Conference to be held in Brisbane
27 Mar 2024
Austroads guidance on bridge maintenance and management updated
31 Oct 2023
New Austroads technical specifications on bridgeworks published
Sign up for our monthly newsletter RoadWatch Roundup
Name
Email
Hide Feedback button
Feedback
Close
Feedback form
Name
Email
Repeat email address
Telephone
What type of feedback would you like to leave?
Select…
Compliment
Complaint
Suggestion
Feedback text area...
Would you like a response?
Yes
No