Publications

Filter
Topic
Publication State
Showing 41 - 50 of 163 Publications
Asphalt Joints
This Pavement Work Tip details techniques to ensure that joints in asphalt do not create a point of weakness due to poor compaction and that correct shape and ride quality are maintained.
Production and Paving of EME2
This Pavement Work Tip details the production and paving of EME2, a high modulus asphalt produced with a very hard paving grade bitumen and a high binder content.
Webinar: National Specification for Crumb Rubber Binders in Asphalt and Seals
Australia and New Zealand produce about 510,000 tonnes of end‑of‑life tyres annually. Crumb rubber derived from end‑of‑life tyres has been used in Australia for several decades to enhance the performance of binders used in sprayed seals but prior to…
Best Practice Guidance to Meet the Changing Needs of Transport Network Operations: Strategic Review of Austroads Guide to Traffic Management
This study aims to set a clear plan for the evolution of the Austroads Guide to Traffic Management to ensure it continues to meet the needs of users and remains a critical resource for member agencies and industry. The study was undertaken over…
National Specification for Crumb Rubber Binders in Asphalt and Seals
Crumb rubber binders have been used to construct sprayed seals in Australia for many decades but have not been utilised in asphalt in the past. Due to the lack of crumb rubber binder grades in the Australian national polymer modified binder (PMB)…
Webinar: Use of Recycled Plastics in Road Surfacing
The ban on the export of recycled waste plastic by the Australian government has led to interest in the use of recycled waste plastic in road surfacing applications. Austroads has published a report, Interim guidelines for the use of recycled waste…
Webinar: Technical Basis of Changes to Guide to Pavement Technology
Austroads has published two technical reports drawing together the research underpinning changes made to key components of the Guide to Pavement Technology. The reports detail the technical basis for changes made to 
Preparing Pavements for Resealing – Planning of Works
This Pavement Work Tip provides guidelines for the planning of works in preparation for resealing.
Initial Treatments – Priming of Pavements
This Pavement Work Tip provides guidance on the selection and design of primes.
Sprayed Sealing – Uniformity and Neatness
This Work Tip details work practices that help ensure uniformity of Binder Application Rates and neatness of joints in sprayed seals.