Publications

Filter
Topic
Publication State
Showing 31 - 40 of 46 Publications
Webinar: Connected and Automated Vehicles Trials
This webinar, presented on 3 July 2018, provides an overview of the progress and key lessons learnt from three major Connected and Automated Vehicles (CAV) trials in Australia. It covers: ARRB/ConnectEast/VicRoads development of road certification…
Webinar: Modelling of High Productivity Vehicles in Metropolitan Areas
This webinar, presented on 13 February 2018, outlines the findings of an Austroads project on the modelling of high productivity vehicles in metropolitan areas. It covers literature review on the impacts to road operation, stakeholder consultation…
Modelling for High Productivity Vehicles in Metropolitan Areas
This report examines the impact of PBS 2B vehicle access on metropolitan roads.
Planning for the Hopkins River Bridge Project
If we knew the work that goes into the planning and pre-construction activities of a new bridge project
Reassessment of the Benefits and Impacts of the Use of High Productivity Vehicles on Australian Highway Pavements
This report reassesses the benefits and impacts of using High Productivity Vehicles (HPVs) and proposes a method to consistently quantify pavement vertical loading of an individual vehicle design.
Guide to Project Delivery Part 1: Overview
The Guide to Project Delivery consists of five parts. Part 1 explains the context of project delivery in relation to the asset management functions and strategic planning process and its role and importance within the overall project management…
Guide to Project Delivery Part 4: Direct Management of Project Works
Guide to Project Delivery consists of five parts. Part 4 outlines appropriate standards of practice and procedures for the delivery of works by direct management. It assumes that the agency has committed to undertake works using a direct managed…
Performance Based Standards Level 1 Length Limit Review
This report outlines the application of a methodology developed for assessing the impact of a potential length increase for PBS Level 1 vehicles, based on the assessment criteria identified and discussed in workshops conducted in 2011. Fifty-five…
Ballina Bypass Alliance -Tackling Quality
In 2008, the Roads and Traffic Authority (RTA) of New South Wales(NSW) advised all contractors to improve workmanship quality across all RTA construction projects. This followed the discovery that many structures, including bridges, were not being…
Improving the Quality of Bridge (and Road) Construction
The RTA has a large and growing construction budget each year for new works. All major works are carried out under Quality Assurance (QA) contracts. QA has been used to deliver construction contracts within the RTA since the early 1990’s. Within the…