Publications

Filter
Topic
Publication State
Showing 31 - 40 of 118 Publications
Deformation Performance of Foamed Bitumen Stabilised Pavements Under Full-scale Accelerated Loading
This report details the first phase of Austroads project TT2046 Improving the Cost Effectiveness of Foamed Bitumen Stabilised Pavements which evaluated the deformation performance of foamed bitumen stabilised materials
Webinar: Bituminous Binders and Selection and Design of Sprayed Seals: Guide to Pavement Technology Parts 4F and 4K
This webinar, presented on 31 October 2018, provides an overview of the key changes to the Guide to Pavement Technology Parts 4F and 4K, and the significant advances in the areas of binder specifications and sprayed seal design.
Design and Performance of Foamed Bitumen Stabilised Pavements
There is a need to improve the Austroads procedures for mix design and structural design of foamed bitumen stabilised (FBS) materials. This final report summarises the mix design test methods developed within the context of an Austroads mix design…
Guide to Pavement Technology Part 4F: Bituminous Binders
Guide to Pavement Technology Part 4F: Bituminous Bindersprovides guidance on the use of bituminous materials in road construction and maintenance. Bituminous materials include bitumen obtained from refining crude petroleum oil and products derived…
2017 Revision of Australian Standard AS 5100 Part 2: Design Loads
Part 2 Design loads of Australian Standard AS 5100 Bridge design sets out the parameters for loads on all bridges in Australia. There have been numerous enhancements to improve the scope, clarity and intent. Design loads for road traffic barriers…
2017 Revision of Australian Standard AS 5100 Part 1: Scope and General
AS 5100 is the only Australian standard specific to bridges. For the first time, the scope has been extended from primarily a structural design standard to include other bridge related topics including safety-in-design, climate change and…
AS(AS/NZS) 5100 - 2017: Rail Bridge Design and Ratings - Key Changes
The revision of AS(AS/NZS) 5100 series has resulted in key changes to the provisions for train braking loads, dynamic load allowance, train collision loads, bridge bearings and design for light rail bridges. Longitudinal rail force provisions have…
A Rail Bridge in Twenty Days: The Torrens To Torrens North:South Corridor Upgrade
The Torrens Road to Torrens River (T2T) project forms part of the overall North-South Road Corridor upgrade in Adelaide, South Australia and incorporates many components such as a new lowered motorway, road, service and pedestrian bridges, retaining…
Replacement Of Four Long Bridges In Fiji Islands
Four bridges in the Fiji Islands were recently replaced using a Design and Construction procurement method for the Fiji Road Authority. The bridges provided vehicle, pedestrian and Fiji Sugar Corporation cane trains over waterways subjected to…
Epping To Thornleigh Third Tracking (Ettt) Project - M2 Bridge Alternative Design, Sydney
The existing rail lines at this location sit on a marginally stable embankment of 1.5:1 slope and height varying between 6m to 15m. The existing lines cross the M2 motorway via an under-bridge and Devlin’s creek via an old masonry arch culvert.