Publications

Filter
Topic
Publication State
Showing 41 - 50 of 510 Publications
Echuca Moama Bridge Project - Campaspe River Road and SUP Bridge Challenges
The $323.7 million Echuca Moama Bridge Project involves construction of a new link road between Warren Street in Echuca and Boundary Road in Moama at Stage 3 of works. As part of the project, a new 2-lane road bridge and shared use path (SUP) bridge…
The 100+ club and a bridge that built a better community
Bridge Engineers, Design Managers, Constructors and Clients. We are all part of a privileged bridge community who deliver important infrastructure that stands for 100 years or more. Yet, we commonly understate and underestimate the importance of our…
Tonkin Gap & Associated Works Project - Southern and Northern Dive Structures with Integral Bridges
The $400 million Tonkin Gap and Associated Works Project is part of an infrastructure package delievered for Main Roads WA and PTAWA. The contract was awarded to the Tonkin Gap Alliance - BMD, Georgiou Group, WA Limestone, BG&
The SH1-18 Underpass on Auckland's Northern Corridor Improvements Project
The Northern Corridor Improvements project is an accelerated highway development scheme that is being delivered under an alliance contract for Waka Kotahi NZ Transport Agency (Waka Kotahi) to improve travel time and reliability of inter-regional…
Load combinations and factors for the Waka Kotahi Bridge manual
Waka Kotahi NZ Transport Agency issued in early 2022 a substantial amendment (amendment 4) to the Bridge manual (3rd edition). A feature of the amendment is a significant upgrade of the design load combinations and load factors. The Bridge manual…
Design and Construction of the Eumemmerring Creek Bridge
The Eumemmerring Creek Bridge is located on the Cranbourne Line, beyond Dandenong in Melbourne's southeast. The single-track rail bridge was opened to rail traffic on Feb 2022, duplicating the existing track, and forms part of the wider Cranbourne…
Design of a challenging ramp connecting Footscray Road to CityLink Northbound as part of the West Gate Tunnel Project
As part of the West Gate Tunnel Project, the existing exit ramp from Footscray Rd westbound lanes to the elevated CityLink northbound lanes is to be upgraded and extended to form a new ramp (Ramp F3) that improves connection from Footscray Rd to…
Integral bridge with full height abutment requirement and design
Many level crossings have been removed in Victoria since 2016 to improve safety for road users and pedestrians. Typically, they are single span or two span bridges over existing rail tracks and without batter in front of abutment to allow rail…
Pilot Study to Improve Sustainability of Bridges and Civil Structures
The paper presents a whole life cycle analysis of bridges and civil structures with due consideration of environment and economic aspects. The study is presented considering variables of constituent materials components so as to reduce the…
Cross River Rail's Exhibition Viaducts
The Rail Integration and Systems (RIS) Alliance (comprising the Cross River Rail Delivery Authority, Queensland Rail, CPB contractors, UGL, Aecom and Jacobs) is part of Brisbaneís wider Cross River Rail (CRR) project to provide the rail systems…