Publications

Filter
Topic
Publication State
Showing 41 - 50 of 122 Publications
Optimising Project Delivery Performance
Austroads commissioned this study to investigate the current challenges and issues affecting the delivery of transport infrastructure projects and the consequential impacts on value for money, timeliness of delivery, agency and political reputation.…
Anti-Graffiti Coatings
Austroads Technical Specification ATS 5820 specifies the requirements for the supply and application of anti-graffiti coating systems to structures, roadside furniture and traffic controller boxes. It excludes the application of coating systems to…
Effectiveness of Anti-Graffiti Coatings
This test method determines the performance of anti-graffiti coatings and is based on Main Roads Western Australia Testing Method for Anti-Graffiti Coatings 6706-02-2238. This Test Method assesses the following properties: ease of removing graffiti…
Waterproofing of Concrete Bridge Decks
Austroads Technical Specification ATS 5350 sets out the requirements for the supply of materials and application of waterproofing membrane systems on new or existing concrete bridge decks. It does not cover waterproofing membrane systems for use on…
Cathodic Protection of Concrete Structures
Austroads Technical Specification ATS 5390 sets out the requirements for the cathodic protection (CP) of steel in atmospherically exposed, buried and submerged concrete. It covers both new and existing structures and includes: assessment of existing…
Supply of Bolts, Nuts and Washers
Austroads Technical Specification ATS 5420 sets out the requirements for the supply of bolts, nuts, screws, washers, studbolts and threaded rods for steelwork. It also includes requirements for the supply of stainless steel fasteners. This…
Rectification of Captain Cook Bridge Bearings
Captain Cook Bridge is an iconic bridge crossing the Brisbane River, and is the most trafficked bridge in Queensland, connecting the City’s south with the Brisbane Central Business District (CBD).
Thermal Movements of Tasman Bridge
Tasman Bridge crosses the Derwent River joining Hobart to its eastern suburbs. It was built in the early 1960’s and reflects design concepts of the time. It is articulated so that the main viaducts are restrained by the abutments, with very slender…
The New AS 5100.8
  • ABC2017-073-17
  • 21 Apr 2017
  • Bridges
The new AS 5100.8 Rehabilitation and Strengthening sets out minimum requirements for the repair, extension of service life, strengthening, change of function (such as a road bridge to a pedestrian/cyclist bridge) and widening to existing bridge…
Trough-to-Deck Weld in Steel Orthotropic Deck of West Gate Bridge
As with other similar bridges throughout the world, the steel box girder spans of Melbourne’s West Gate Bridge have, in recent years, exhibited an increasing incidence of fatigue cracking.