The report provides a summary of works undertaken during the period 2016–17 for the Austroads project AT1064 – Long-term pavement performance (LTPP).
Austroads has funded the long-term pavement performance study since late 1994. The project monitors…
This report details investigations that were conducted to verify the new Austroads sprayed seal design guidelines.
To verify the appropriateness of the proposed basic voids factor (Vf), and the initial sealing design approach (and also to validate…
This report describes research into development of a laboratory sprayed seal binder cracking test which can be used to measure the relative fatigue cracking resistance of thin binder films which have thicknesses comparable to the thicknesses of the…