Publications

Filter
Topic
Publication State
Showing 21 - 30 of 116 Publications
Guide to Asset Management Technical Information Part 12: Pavements Asset Management
Part 12 of the Guide to Asset Management is directed at practitioners involved in all aspects of pavement management. It provides the most up-to-date information, using consistent and efficient processes, for the management, storage, analysis and…
Guide to Asset Management Technical Information Part 15: Technical Supplements
The technical supplements presented in Part 15 of the Guide to Asset Management cover the knowledge and condition assessment of pavements, structures and other assets.
Long-term Pavement Performance (LTPP) Project: Future Directions
This report presents the proposed future directions for long-term pavement performance (LTPP) studies in Australasia. The proposed way forward is based on the results of a 2017 survey directed to the LTPP Project Steering Group (PSG) and Assets Task…
Effectiveness of Maintenance Activities on Pavement Conditions
The aim of this project was to clarify the effectiveness of pavement maintenance (preservation) activities, in the form of periodic maintenance and rehabilitation, on pavement condition and distress (roughness, rutting and cracking) deterioration…
Austroads LTPP/LTPPM Study - Summary Report 2016–17

The report provides a summary of works undertaken during the period 2016–17 for the Austroads project AT1064 – Long-term pavement performance (LTPP).

Austroads has funded the long-term pavement performance study since late 1994. The project monitors…

Heavy Vehicle Horizontal Stresses and Pavement Surface Performance

This report presents the findings of Austroads Project AT1540 Understanding the impact on pavement surfaces from next generation freight vehicles and developing practical network prediction models and responses. The main purpose of the project was…

Austroads LTPP/LTPPM Study - Summary Report 2015-16

This report provides a summary of activities completed during 2015–16 for the Austroads long term pavement performance monitoring project.

Austroads has funded the long-term pavement performance study since late 1994. The project monitors the…

Revised Interim Works Effect Models

This study sought to extend the understanding of pavement works effects (WE) by extending the scope of WE treatments and evaluation measures previously used.

The study was based on data extracted from Austroads long?term pavement performance (LTPP)…

Unsealed Road Maintenance and Deterioration Performance

This report describes a two-year study designed to quantify the immediate and longer-term maintenance impact of grader blading and surface re-sheeting on unsealed roads.

The project assembled and analysed roughness data collected by Cassowary Coast…

Austroads LTPP / LTPPM Study - Summary Report 2014-15

This report provides a summary of activities completed during 2014–15 for the Austroads long term pavement performance monitoring project.

Austroads has funded the long-term pavement performance study since late 1994. The project monitors the…