Publications

Filter
Topic
Publication State
Showing 31 - 40 of 75 Publications
Weather Resistant Steel As Viable Option For Country Timber Bridge Replacements
Steel in bridge construction in Australia has declined significantly over the last 40 years from around 25% of bridges to as low as 5% of bridges in recent years. The main reasons for this have been the proliferation of precast prestressed concrete…
Country Bridge Solutions
  • ABC2017-034-17
  • 20 Apr 2017
  • Bridges
Local councils face the growing challenge, as road authorities, of maintaining and eventually replacing ageing bridges on regional and local roads.
Rehabilitation of Corrugated Metal Pipe Culverts: Asset management
VicRoads monitors a number of structures along its road networks through the structure monitoring program. In October 2014, VicRoads identified significant corrosion on two triple-cell corrugated metal culverts under the Mornington Peninsula Freeway…
Reassessment of the Benefits and Impacts of the Use of High Productivity Vehicles on Australian Highway Pavements
This report reassesses the benefits and impacts of using High Productivity Vehicles (HPVs) and proposes a method to consistently quantify pavement vertical loading of an individual vehicle design.
Developing Braking Standards for Heavy Vehicles to Brake Effectively and Safely on Steep Declines
This report proposes a new rule for inclusion in the Performance Based Standards scheme, adding a requirement for applicant vehicles to meet a minimum level of auxiliary braking performance. The purpose of the new rule is to ensure that PBS vehicles…
Expansion of the Performance Based Standards Route Assessment Tool (PBS RAT)
This report summarises the outcomes of an Austroads project which investigated expansion options and priorities for the Performance Based Standards Route Assessment Tool (PBS RAT). The PBS RAT is an online tool designed to help local government road…
Improved Bridge Deterioration Models, Predictive Tools and Costs
The management of Australia and New Zealand’s bridge stock involves the development of forward works programs for periods up to, and longer than, ten years into the future. The scheduling of maintenance, rehabilitation and replacement, forms part of…
PBS Level 3 and 4 Standards Review
This report details a review undertaken to identify potential issues that are limiting the uptake of the PBS (Performance Based Standards) Level 3 and 4 vehicles and provide recommendations for improving the standards to increase the use of safer…
Time-Variant Performance Indicators for Concrete Bridges Exposed to Corrosion
The life-cycle performance of concrete bridges exposed to corrosion is investigated based on a set of time-variant probabilistic performance indicators including structural reliability, redundancy, robustness and resilience. The performance…
Lifetime Performance, Risk and Sustainability of Bridges
Infrastructure transportation systems play an important role in the sustained economic growth and social development of most countries. Bridges are key components in such systems. During their service life, bridges are subjected to progressive and/…