Skip navigation
Open main navigation
Open/Close Search bar
Search
View Cart
Drivers & Vehicles
Toggle
Drivers & Vehicles
This section includes managing drivers with health risks, requirements for visiting drivers, NEVDIS, and the introduction of connected and automated vehicles to Australasia.
Assessing Fitness to Drive
Vehicles and Technology
NEVDIS
Overseas Drivers
Registration and Licensing
Road Safety & Design
Toggle
Road Safety & Design
This section covers safety barrier assessments, and the work of the Road Safety Task Force and Road Design Task Force.
Barrier Assessment
Road Safety
Road Design
Safety Hardware Training and Accreditation Scheme (ASHTAS)
Transport Operations
Toggle
Transport Operations
In this section you'll find information about our work to improve the efficient, reliable and safe operation of the road network for all road users.
Network Operations
Traffic Management
Temporary Traffic Management
Freight
Active Travel
Transport Infrastructure
Toggle
Transport Infrastructure
This section includes information about strategic asset management, the management of bridges, pavements and tunnels, project delivery and the national prequalification system.
Asset Management
Bridges
National Prequalification
Pavements
Project Delivery
Road Tunnels
Technical Specifications
About
Contact
News
Events
Projects
Publications
Tenders
Login
Home
Publications
Publications
Share
Subject area
All
Bridges
Connected and Automated Vehicles
Search publications library
Filter
Open/Close All Filters
Type
Type
Bridge Conference Papers
33
Research Reports
3
Webinars
2
Topic
Topic
Active travel
41
Aggregates
41
Alcohol interlocks
39
Annual reports
39
Asphalt
51
Assessing Fitness to Drive
41
Automated vehicle policy
Automated vehicle safety
39
Bicycles
40
Binders
42
Binders test methods
45
Bitumen
47
Bituminous mixes test methods
46
Bridge assessment
Bridge barriers
39
Bridge components
53
Bridge construction
80
Bridge design
102
Bridge maintenance
64
Bridge management
55
Bridge materials
65
Bridge performance
53
Bridgeworks specifications
42
Capability assessment
40
Climate change
41
Concrete
44
Congestion
40
Contracts
40
Data management
42
Digital infrastructure
39
Drainage
41
Driver licensing
42
Drugs and alcohol
40
Earthworks
41
Economic evaluation
39
Electric vehicles
43
Freight modelling
40
Freight policy
40
Guide review
44
Heavy vehicle access
40
Heavy vehicle safety
40
Hydrogen vehicles
40
Incident management
40
Materials testing
47
Network management
41
Network operations
40
Older drivers
40
Pavement design
42
Pavement investigation test methods
39
Pavement maintenance
39
Pavement performance
44
Pavements specifications
41
Pedestrians
41
Prequalification
39
Procurement
40
Project governance
40
Project planning
43
Public transport
41
Recycled material
52
Roadside design
42
Rural and remote
39
Safe people
43
Safe roads
48
Safe System
41
Safe vehicles
40
Safety audit
41
Safety programs
39
Safety strategy
39
Seals
44
Smart motorways
40
Speed management
42
Stabilised materials
41
Strategic asset management
39
Structures management
39
Temporary traffic management
40
Traffic controls
41
Traffic management
41
Transport planning
39
Tunnel design
42
Tunnel operations
41
Tunnel safety
43
Year
Year
2023
43
2022
2021
42
2020
46
2019
39
2018
45
2017
61
2016
39
2014
56
2011
43
Publication State
Publication State
Live
Sort by:
Relevance
Date (Newest first)
Date (Oldest first)
Title (A-Z)
Title (Z-A)
Publication Code (A-Z)
Publication Code (Z-A)
Showing 1 - 10 of 38 Publications
Automated vehicle policy
Remove Automated vehicle policy filter
Bridge assessment
Remove Bridge assessment filter
2022
Remove 2022 filter
Live
Remove Live filter
Clear all filters
Clear all filters
Fully-matching results
Existing Ballasted Rail Bridge Assessment - Benefits of a Rail Structure Interaction Analysis
ABC2022-056-22
18 Nov 2022
Bridges
More
A load rating was undertaken as part of the asset owners regular periodic load rating on a 139 m total length, 12-span bridge carrying a single ballasted rail track on curved horizontal and vertical alignment originally constructed in 1996. The…
Assessment Methods for Historic Steel Truss Bridges
ABC2022-008-22
18 Nov 2022
Bridges
More
New Zealand has many historic and significant steel truss road and rail bridges, with the majority of these constructed between early 1900s to mid-1960s. Steel truss bridges are able to span long distances, and bridge members commonly include…
Strengthening Bridges of the West Gate Tunnel Project
ABC2022-026-22
18 Nov 2022
Bridges
More
In addition to providing the southern hemisphere's largest-diameter tunnel as an alternative major Yarra River crossing to ease congestion on the 50-year-old West Gate Bridge, the West Gate Tunnel Project is also one of Australia's largest bridge…
Alice River Bridge Pier 4 Settlement - Investigation and Rehabilitation
ABC2022-004-22
18 Nov 2022
Bridges
More
In late 2019, a concerned driver reported significant settlement at the Alice River Bridge on the Landsborough Highway (Blackall ñ Barcaldine) in Queensland, Australia. This ten span 140 m long bridge was constructed circa 1976, with each pier…
UAV-based multi-layered data collection methods and defection algorithms for Predictive Analutics and Bridge Asset Management
ABC2022-136-22
18 Nov 2022
Bridges
More
Traditional inspection procedure for condition assessment of bridge structures is laborious, dangerous, time-consuming, capital intensive and highly dependent on subjective human judgment. Subsequently, bridge asset owners pay a high price per…
'Smart' bridge components (expansion joints, bearings, seismic devices) for intelligent infrastructure
ABC2022-116-22
17 Nov 2022
Bridges
More
The potential benefits of using structural health monitoring systems in measuring and recording bridge data have been established in many applications around the world, but the efficiency and effectiveness of such systems depends on how they are…
To Achieve Durable and Sustainable Concrete
ABC2022-134-22
17 Nov 2022
Bridges
More
Asset owners are interested in the use of durable concrete to maximize design life of their structures and minimize Whole of Life Cost (WOLC) throughout. Similarly, most assets owners nowadays also require their assets to be sustainable and…
Case Study: Sustainability in Bridge Engineering - SH2 Wairoa River Bridge Cycleway Extension
ABC2022-114-22
17 Nov 2022
Bridges
More
State Highway 2 Wairoa River Bridge near Tauranga, constructed in 1966, is a 177m long post-tensioned concrete structure with mono pier columns supported on pile foundations. Adding a lightweight downstream cycleway extension in September 2020 has…
Adopting Probability-Based Bridge Assessments in Australasia
ABC2022-104-22
17 Nov 2022
Bridges
More
Outputs from bridge assessment to AS 5100.7 are deterministic, expressing safety as a subjective and conservative binary (yes/no) measure. With Australia and New Zealand seeing increases of road freight demand under finite bridge infrastructure…
Heavy vehicles and bridges: What the data is telling us?
ABC2022-066-22
17 Nov 2022
Bridges
More
Evidence gathered on some Queensland bridges has raised questions about what heavy vehicles are really doing to bridges. Visual evidence includes the deterioration of concrete bridge decks, headstock cracking, fatigue cracking, settlement of bridge…
1
2
3
4
Next
Latest news
21 May 2024
New report details findings of survey of medical practices and practitioners
13 May 2024
Austroads and AfPA update bituminous binder sampling practice guidelines
9 May 2024
Neil Scales honoured with Austroads Medal for transformational leadership
Sign up for our monthly newsletter RoadWatch Roundup
Name
Email
Hide Feedback button
Feedback
Close
Feedback form
Name
Email
Repeat email address
Telephone
What type of feedback would you like to leave?
Select…
Compliment
Complaint
Suggestion
Feedback text area...
Would you like a response?
Yes
No