Skip navigation
Open main navigation
Open/Close Search bar
Search
View Cart
Drivers & Vehicles
Toggle
Drivers & Vehicles
This section includes managing drivers with health risks, requirements for visiting drivers, NEVDIS, and the introduction of connected and automated vehicles to Australasia.
Assessing Fitness to Drive
Vehicles and Technology
NEVDIS
Overseas Drivers
Registration and Licensing
Road Safety & Design
Toggle
Road Safety & Design
This section covers safety barrier assessments, and the work of the Road Safety Task Force and Road Design Task Force.
Barrier Assessment
Road Safety
Road Design
Safety Hardware Training and Accreditation Scheme (ASHTAS)
Transport Operations
Toggle
Transport Operations
In this section you'll find information about our work to improve the efficient, reliable and safe operation of the road network for all road users.
Network Operations
Traffic Management
Temporary Traffic Management
Freight
Active Travel
Transport Infrastructure
Toggle
Transport Infrastructure
This section includes information about strategic asset management, the management of bridges, pavements and tunnels, project delivery and the national prequalification system.
Asset Management
Bridges
National Prequalification
Pavements
Project Delivery
Road Tunnels
Technical Specifications
About
Contact
News
Events
Projects
Publications
Tenders
Login
Home
Publications
Publications
Share
Subject area
All
Bridges
Search publications library
Filter
Open/Close All Filters
Type
Type
Conference Papers
Guides
1
Topic
Topic
Active travel
17
Bicycles
28
Bridge assessment
61
Bridge barriers
23
Bridge components
53
Bridge construction
112
Bridge design
197
Bridge maintenance
79
Bridge management
87
Bridge materials
72
Bridge performance
38
Climate change
18
Concrete
55
Data management
17
Digital engineering (BIM)
23
Economic evaluation
17
Fibre reinforced polymer
Heavy vehicle access
25
Heavy vehicle weighing
18
Materials testing
18
Network management
18
Network performance
17
Pedestrians
36
Project governance
20
Public transport
18
Rail bridges
47
Recycled material
17
Rural and remote
20
Steel
40
Structure management
18
Structures management
41
Timber
22
Waterway design
Year
Year
2017
6
2014
3
2011
7
Publication State
Publication State
Live
Sort by:
Relevance
Date (Newest first)
Date (Oldest first)
Title (A-Z)
Title (Z-A)
Publication Code (A-Z)
Publication Code (Z-A)
Showing 1 - 10 of 16 Publications
Conference Papers
Remove Conference Papers filter
Fibre reinforced polymer
Remove Fibre reinforced polymer filter
Waterway design
Remove Waterway design filter
Live
Remove Live filter
Clear all filters
Clear all filters
Fully-matching results
The Torsional Strengthening of Concrete Girders Using the NSM FRP Technique with Different Configurations
ABC2017-127-17
26 Apr 2017
Bridges
More
The near-surface mounted (NSM) FRP technique has received attention worldwide over the externally bonded FRP strengthening technique. Strengthening of a concrete girders using fiber reinforced polymer (FRP) composites to flexural and shear…
Strength Enhancement of Fire-damaged RC Circular Bridge Columns using CFRP Fabrics
ABC2017-126-17
26 Apr 2017
Bridges
More
In recent years the circumferential wrapping with externally-bonded carbon fibre-reinforced polymer (CFRP) composites has proven to be a promising method for strengthening concrete structures. This is particularly valuable when repairing concrete…
Monash Freeway Bridge Strengthening Project: Constructability of Carbon Fibre Rods Under Constrained Traffic and Environmental Conditions
ABC2017-110-17
26 Apr 2017
Bridges
More
Strict environmental requirements and the standard specification and procedure for installing carbon fibre bridge strengthening system have naturally led to the works being undertaken during warmer months and on sections of the bridge that have been…
Effect of Factors Influencing Bridge Scour
ABC2017-162-17
26 Apr 2017
Bridges
More
Scour has been identified as one of the main causes of bridge failures in Australia and worldwide. Accurate estimation of scour around bridge piers is challenging as it requires a comprehensive analysis of the interactions between fluid, soil and…
The Development of FRP Strengthening on the Victorian Road Network over the Last 17 Years
ABC2017-012-17
20 Apr 2017
Bridges
More
The global use of FRP (Fibre Reinforced Polymer) strengthening systems for bridge infrastructure has increased over the last 40 years, typically in North America, Europe and Japan. After a slow beginning, its
Investigation the Influence of FRP Application Performance on Fatigue Life Behavior of CFRP Laminates Bonded to Concrete Block
ABC2017-018-17
20 Apr 2017
Bridges
More
In this paper, two methods of FRP applications were carried out to study the fatigue life performance of CFRP laminates bonded to RC concrete block, by mean of investigating the influence of bond behavior application under cyclic loadings.
Incorporating ACI 440.8 into AS 5100.5 for FRP Strengthening Via M80 Upgrade Project Case Study
ABC-DES203-14
22 Oct 2014
Bridges
More
As bridges age and standards evolve, it has become increasingly necessary to strengthen existing bridges as a much cheaper option than replacing bridges as a whole.
Flood Resilient Bridge Design, Case Studies from Challenging Design Environments
ABC-LCM103-14
22 Oct 2014
Bridges
More
Case studies of bridges located in the Lockyer Valley in Queensland and the Solomon Islands are presented in the paper. Historically these locations have experienced extreme flooding. Flood damage at bridges can isolate communities and result in…
Namoi Floodplain Viaduct: Design of a 1 Km Rail Viaduct in a Remote Area for a 35-Year Design Life
ABC-DES301-14
22 Oct 2014
Bridges
More
The Boggabri Maules Creek Rail project will connect the existing Werris Creek to Mugindi railway line to the existing Boggabri Coal Mine and the new Maules Creek Coal Mine.The railway line will provide Boggabri Coal Mine with improved logistics,…
Strengthening of the West Gate Bridge Concrete Viaducts
ABC-MAR024-11
31 Oct 2011
Bridges
More
The 2.5km long West Gate Bridge comprises an eastern and western concrete approach viaduct, 871m and 670m respectively in length either side of the 850 m long cable stayed steel box girder main span section. The key objective with the West Gate…
1
2
Next
Latest news
21 May 2024
New report details findings of survey of medical practices and practitioners
13 May 2024
Austroads and AfPA update bituminous binder sampling practice guidelines
9 May 2024
Neil Scales honoured with Austroads Medal for transformational leadership
Sign up for our monthly newsletter RoadWatch Roundup
Name
Email
Hide Feedback button
Feedback
Close
Feedback form
Name
Email
Repeat email address
Telephone
What type of feedback would you like to leave?
Select…
Compliment
Complaint
Suggestion
Feedback text area...
Would you like a response?
Yes
No